4454 N Van Nuys Blvd Blvd, Los Angeles: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 25, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 4454 N Van Nuys Blvd Blvd, Los Angeles was permitted on September 14, 2026 with a stated construction value of under $1M. EXTERIOR FACADE AND STOREFRONT REMODEL OF EXIST TWO STORY OFFICE & RETAIL BUILDING C. RESTRIPE PARKING STALLS. install add. outdoor open patio areas and landscaping. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address4454 N Van Nuys Blvd Blvd, Los Angeles
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Permit issuedSeptember 14, 2026
Stated construction valueunder $1M
Estimated stageExcavation
Company named on the permitSperling Group Inc See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “EXTERIOR FACADE AND STOREFRONT REMODEL OF EXIST TWO STORY OFFICE & RETAIL BUILDING C. RESTRIPE PARKING STALLS. install add. outdoor open patio areas and landscaping”

Where this project is

  1. September 14, 2026Alteration: Office and Tenant Fit-Out · under $1M (this page)
  2. September 2026Estimated construction start (estimate)
  3. April 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Sperling Group Inc has 5 other projects in Builtie

  • Los Angeles · Addition: interior alteration · $1M to $5M · 2026
  • Los Angeles · Alteration: facade work · under $1M · 2026
  • Los Angeles · Interior alteration · under $1M · 2026

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 8 to approach now, 1 passed.

TradeWhen to approach (est.)Status
Construction (est.)Sep 2026 – Apr 2027Estimate
Excavation and Site WorkSep 2026Window passed (est.)
Construction Site SecuritySep 2026 – Oct 2026Approach now
Concrete and FoundationSep 2026 – Oct 2026Approach now
Structural SteelSep 2026 – Oct 2026Approach now
ElevatorsSep 2026 – Nov 2026Approach now
FramingSep 2026 – Nov 2026Approach now
PaintingOct 2026 – Dec 2026Approach now
MasonrySep 2026 – Oct 2026Approach now
WaterproofingSep 2026 – Oct 2026Approach now

How we estimate: each bar is the share of the build, from the estimated start (September 2026) to the estimated completion (April 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Los Angeles

All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 4454 N Van Nuys Blvd Blvd?

Office and Tenant Fit-Out. EXTERIOR FACADE AND STOREFRONT REMODEL OF EXIST TWO STORY OFFICE & RETAIL BUILDING C. RESTRIPE PARKING STALLS. install add. outdoor open patio areas and landscaping

When was the permit issued for 4454 N Van Nuys Blvd Blvd?

September 14, 2026, by the City of Los Angeles.

Who is building 4454 N Van Nuys Blvd Blvd?

Sperling Group Inc is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 4454 N Van Nuys Blvd Blvd need now?

Estimated as of October 2026, the trades to approach now are site security, concrete, structural steel, elevator, framing, painting, masonry and waterproofing. Already passed: excavation and site work.