466 West End Avenue, Manhattan, New York City: Commercial Project Renovation

Commercial Project Renovation at 466 West End Avenue, Manhattan, New York City was permitted on June 10, 2026 with a stated construction value of under $1M. Modifications to existing toilet rooms on several floors for ADA accessibility including relocation of (2) lavatories. Replacement of the flooring system at the gymnasium. Replacement of wall pads. Minor repairs. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 466 West End Avenue, Manhattan, New York City |
| Project | Commercial Project Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | June 10, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Modifications to existing toilet rooms on several floors for ADA accessibility including relocation of (2) lavatories. Replacement of the flooring system at the gymnasium. Replacement of wall pads. Minor repairs”
Get new $1M+ projects in New York City every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- June 10, 2026Alteration: Commercial Project Renovation · under $1M (this page)
- June 11, 2026Alteration: plumbing · under $1M
- August 5, 2026Alteration: mechanical · under $1M
- August 7, 2026Alteration: mechanical · $1M to $5M
- September 18, 2026Alteration: mechanical · $1M to $5M
- July 2026Estimated construction start (estimate)
- January 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 3 more renovations within 1 km
- 171 Riverside Drive, ManhattanAlteration: foundation · $25M to $50M · September 2026
- 170 Central Park West, ManhattanAlteration CO: addition · $25M to $50M · August 2026
- 214 West 80 Street, ManhattanAlteration CO: conversion to residential · $5M to $10M · April 2026
- 2508 Broadway, ManhattanAlteration: facade work · $5M to $10M · June 2026
- 131 West 86 Street, ManhattanInterior alteration · $1M to $5M · June 2026
28 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jul 2026 – Jan 2027 | Estimate |
| Construction Site Security | Jun 2026 – Aug 2026 | Window passed (est.) |
| Concrete and Foundation | Jul 2026 | Window passed (est.) |
| Structural Steel | Jul 2026 – Aug 2026 | Window passed (est.) |
| Elevators | Jul 2026 – Aug 2026 | Window passed (est.) |
| Framing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Painting | Jul 2026 – Sep 2026 | Window passed (est.) |
| Masonry | Jul 2026 – Aug 2026 | Window passed (est.) |
| Waterproofing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Roofing | Jul 2026 – Sep 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Jul 2026 – Aug 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (July 2026) to the estimated completion (January 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 548 East 183 Street, Bronx: Hotel Renovation
- 659 Grand Street, Brooklyn: 6-Storey Apartment Building
- 1701 Popham Avenue, Bronx: 2-Storey Office-to-Residential Conversion
- 169 Stewart Avenue, Brooklyn: Warehouse Renovation
- 201 Gates Avenue, Brooklyn: 3-Storey Office-to-Residential Conversion
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 466 West End Avenue, Manhattan?
Commercial Project Renovation. Modifications to existing toilet rooms on several floors for ADA accessibility including relocation of (2) lavatories. Replacement of the flooring system at the gymnasium. Replacement of wall pads. Minor repairs
When was the permit issued for 466 West End Avenue, Manhattan?
June 10, 2026, by New York City.
Who is building 466 West End Avenue, Manhattan?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 466 West End Avenue, Manhattan need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.