475 West 140 Street, Manhattan, New York City: Apartment Building Renovation

Apartment Building Renovation at 475 West 140 Street, Manhattan, New York City was permitted on April 17, 2026 with a stated construction value of under $1M. Renovation of existing four (4) family dwelling. Work includes non-structural partitions, doors, finishes, facade repairs. Installation of new split system heat pumps for each apartment and common areas. No change of use, egress, or occupancy. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 475 West 140 Street, Manhattan, New York City |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | April 17, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Renovation of existing four (4) family dwelling. Work includes non-structural partitions, doors, finishes, facade repairs. Installation of new split system heat pumps for each apartment and common areas. No change of use, egress, or occupancy”
Get new $1M+ projects in New York City every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- April 17, 2026Alteration: Apartment Building Renovation · under $1M (this page)
- July 1, 2026Alteration: site protection · under $1M
- May 2026Estimated construction start (estimate)
- November 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 4 more renovations within 1 km
- 1430 Amsterdam Avenue, ManhattanAlteration: plumbing · $25M to $50M · September 2026
- 1420 Amsterdam Avenue, ManhattanAlteration: plumbing · $25M to $50M · June 2026
- 103 West 141 Street, ManhattanAlteration CO: structural work · $10M to $25M · April 2026
- 301 West 140 Street, ManhattanAlteration · $5M to $10M · September 2026
- 95 Old Broadway, ManhattanInterior alteration · $5M to $10M · July 2026
33 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | May 2026 – Nov 2026 | Estimate |
| Construction Site Security | Apr 2026 – Jun 2026 | Window passed (est.) |
| Concrete and Foundation | May 2026 | Window passed (est.) |
| Structural Steel | May 2026 – Jun 2026 | Window passed (est.) |
| Elevators | May 2026 – Jun 2026 | Window passed (est.) |
| Framing | May 2026 – Jun 2026 | Window passed (est.) |
| Painting | May 2026 – Jul 2026 | Window passed (est.) |
| Masonry | May 2026 – Jun 2026 | Window passed (est.) |
| Waterproofing | May 2026 – Jun 2026 | Window passed (est.) |
| Roofing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Windows, Doors and Glazing | May 2026 – Jul 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (May 2026) to the estimated completion (November 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 22 St Johns Place, Brooklyn: Apartment Building Renovation
- 1101 Hoe Avenue, Bronx: Office-to-Residential Conversion
- 141 2 Avenue, Manhattan: 6-Storey Apartment Building Renovation
- 481 Kings Highway, Brooklyn: Office and Tenant Fit-Out
- 133 East 58 Street, Manhattan: Office and Tenant Fit-Out
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 475 West 140 Street, Manhattan?
Apartment Building Renovation. Renovation of existing four (4) family dwelling. Work includes non-structural partitions, doors, finishes, facade repairs. Installation of new split system heat pumps for each apartment and common areas. No change of use, egress, or occupancy
When was the permit issued for 475 West 140 Street, Manhattan?
April 17, 2026, by New York City.
Who is building 475 West 140 Street, Manhattan?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 475 West 140 Street, Manhattan need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
