477 Rogers Avenue, Brooklyn, New York City: Office-to-Residential Conversion

Residential development under construction with tower cranes on the skyline
Figures read October 25, 2026 from Builtie's permit data.

Office-to-Residential Conversion at 477 Rogers Avenue, Brooklyn, New York City was filed with New York City on August 17, 2026 with a stated construction value of under $1M; the city has not approved it yet (DOB status: Objections). Conversion of 2nd floor from residential to community facility, interior renovation of 3rd floor residential space and combining (2) buildings on same lot into (1) building, installation of elevator and new staircase. installation of split system ac units. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address477 Rogers Avenue, Brooklyn, New York City
ProjectOffice-to-Residential Conversion
Building typeResidential
WorkRenovation or alteration
Filed with the cityAugust 17, 2026
City statusNot yet approved (DOB status: Objections)
Stated construction valueunder $1M
Estimated stageFiled, not yet approved
Company named on the permitP Gidds Construction LLC See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Conversion of 2nd floor from residential to community facility, interior renovation of 3rd floor residential space and combining (2) buildings on same lot into (1) building, installation of elevator and new staircase. installation of split system ac units”

Where this project is

  1. August 17, 2026Alteration: plumbing · under $1M
  2. August 17, 2026Alteration CO: Office-to-Residential Conversion · under $1M (this page)
  3. August 18, 2026Alteration: fire protection · under $1M
  4. August 2026Estimated construction start (estimate)
  5. March 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

8 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

Builtie estimates the stage from this building's own permits: the conversion filing is not yet approved (DOB status: Objections). The project is filed with the city and not yet approved; strip-out and structural work start once it is.

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 3 to approach now, 3 passed.

TradeWhen to approach (est.)Status
Construction (est.)Aug 2026 – Mar 2027Estimate
Construction Site SecurityAug 2026 – Sep 2026Window passed (est.)
Concrete and FoundationAug 2026 – Sep 2026Window passed (est.)
Structural SteelAug 2026 – Sep 2026Window passed (est.)
ElevatorsAug 2026 – Oct 2026Approach now
FramingAug 2026 – Oct 2026Approach now
PaintingSep 2026 – Nov 2026Approach now

How we estimate: each bar is the share of the build, from the estimated start (August 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 477 Rogers Avenue, Brooklyn?

Office-to-Residential Conversion. Conversion of 2nd floor from residential to community facility, interior renovation of 3rd floor residential space and combining (2) buildings on same lot into (1) building, installation of elevator and new staircase. installation of split system ac units

Has 477 Rogers Avenue, Brooklyn been permitted?

Not yet. The work was filed with New York City on August 17, 2026; the city has not approved it yet (DOB status: Objections).

Who is building 477 Rogers Avenue, Brooklyn?

P Gidds Construction LLC is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 477 Rogers Avenue, Brooklyn need now?

Estimated as of October 2026, the trades to approach now are elevator, framing and painting. Already passed: site security, concrete and structural steel.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.