500 West 33 Street, Manhattan, New York City: Retail Building Renovation

Retail Building Renovation at 500 West 33 Street, Manhattan, New York City was permitted on May 8, 2026 with a stated construction value of under $1M. Store renovation (zara kids) work to include partition, ceiling and door modifications as indicated on plans. no change in use, egress or occupancy. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 500 West 33 Street, Manhattan, New York City |
| Project | Retail Building Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | May 8, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Store renovation (zara kids) work to include partition, ceiling and door modifications as indicated on plans. no change in use, egress or occupancy”
Get new $1M+ projects in New York City every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since March 202617 other permits at this address
- March 26, 2026Alteration: structural work · $1M to $5M
- March 30, 2026Alteration: addition · under $1M
- April 24, 2026Alteration: addition · under $1M
- May 8, 2026Alteration: Retail Building Renovation · under $1M (this page)
- May 12, 2026Alteration: mechanical · under $1M
- July 14, 2026Alteration: structural work · under $1M
- June 2026Estimated construction start (estimate)
- December 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 495 11 Avenue, ManhattanNew building · over $250M · March 2026
- 371 Seventh Avenue, ManhattanAlteration CO: interior alteration · $50M to $100M · October 2026
- 514 West 36 Street, ManhattanNew construction: structural work · $50M to $100M · August 2026
- 2 Penn Plaza, ManhattanInterior alteration · $25M to $50M · July 2026
- 11 Pennsylvania Plaza, ManhattanAlteration · $10M to $25M · October 2026
56 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
The company behind this project has another project in Builtie, with 3 permits
- ████████ ConstructionNew York · Structural · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jun 2026 – Dec 2026 | Estimate |
| Construction Site Security | May 2026 – Jul 2026 | Window passed (est.) |
| Concrete and Foundation | May 2026 – Jun 2026 | Window passed (est.) |
| Structural Steel | Jun 2026 – Jul 2026 | Window passed (est.) |
| Elevators | Jun 2026 – Jul 2026 | Window passed (est.) |
| Framing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Painting | Jun 2026 – Aug 2026 | Window passed (est.) |
| Masonry | Jun 2026 – Jul 2026 | Window passed (est.) |
| Waterproofing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Roofing | Jun 2026 – Aug 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Jun 2026 – Jul 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 89-08 Van Wyck Expressway, Queens: Healthcare Building Renovation
- 1400 Pelham Parkway, Bronx: Healthcare Building Renovation
- 772 Madison Avenue, Manhattan: Apartment Building Renovation
- 397 Douglass Street, Brooklyn: 3-Storey Apartment Building Renovation
- 1510 Sheepshead Bay Road, Brooklyn: Commercial Project Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 500 West 33 Street, Manhattan?
Retail Building Renovation. Store renovation (zara kids) work to include partition, ceiling and door modifications as indicated on plans. no change in use, egress or occupancy
When was the permit issued for 500 West 33 Street, Manhattan?
May 8, 2026, by New York City.
Who is building 500 West 33 Street, Manhattan?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 500 West 33 Street, Manhattan need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.