534 Tahquitz Pl, Pacific Palisades: New accessory dwelling unit (ADU) After the 2025 Fire

Newly built homes under construction on a residential street
Figures read October 20, 2026 from City of Los Angeles building permits.

New accessory dwelling unit (ADU) at 534 Tahquitz Pl, Pacific Palisades, after the January 2025 Palisades Fire: the City of Los Angeles issued the building permit on July 13, 2026 with a stated construction value of $250K to $500K, and the rebuild is at the foundation stage (Builtie's estimate). Builtie tracks every Palisades rebuild permit, the stage of each build and the builder behind it.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The rebuild

Address534 Tahquitz Pl, Pacific Palisades, Los Angeles, CA
City permit address534 N Tahquitz Pl
RebuildNew accessory dwelling unit (ADU)
What the plans show1 storey, accessory dwelling unit
Building permit issuedJuly 13, 2026
StatusAt the foundation stage (Builtie's estimate)
Stated construction value$250K to $500K
Builder named on the permitsLush Remodeling & Development Inc
Permits at this address since the fire1

The facts above are read from the City of Los Angeles building permits filed for 534 Tahquitz Pl since the January 2025 Palisades Fire. Owners and permit numbers are left out.

Permit timeline

IssuedPermitStatus
July 13, 2026New accessory dwelling unit (ADU)Issued

1 permit since July 13, 2026. A typical rebuild runs demolition and debris clearance, grading and retaining walls, the new building, then the pool and site work.

Where it stands

534 Tahquitz Pl is at the foundation stage (Builtie's estimate).

At that stage these trades are inside their award window, the stretch of the build when the builder decides who gets the work:

TradeAward window
Construction Site SecurityBefore the start to 15%
Concrete and FoundationBefore the start to 5%
Structural Steel0% to 15%
Elevators0% to 20%
Framing0% to 20%
Painting5% to 35%
Masonry10% to 30%
Waterproofing10% to 35%
Roofing15% to 35%
Windows, Doors and Glazing15% to 35%

Other rebuilds on Tahquitz Pl

All of them: fire rebuilds on Tahquitz Pl. Every street: the Pacific Palisades fire rebuild tracker.

For contractors

Builtie tracks every Palisades rebuild permit as it is issued, estimates where each build stands, and names the builder behind it, so a trade can reach them while its part of the job is still open. The decision makers and their verified contacts are in Builtie.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 534 Tahquitz Pl, Pacific Palisades?

New accessory dwelling unit (ADU) (1 storey, accessory dwelling unit), permitted July 13, 2026 after the January 2025 Palisades Fire.

What is the status of the rebuild at 534 Tahquitz Pl?

It is at the foundation stage (Builtie's estimate), read October 20, 2026.

Who is building 534 Tahquitz Pl?

Lush Remodeling & Development Inc is named on the permits. The decision makers and contacts are in Builtie.

What does Builtie cost?

Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.