600 World Way, Los Angeles: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 600 World Way, Los Angeles was permitted on August 28, 2025 with a stated construction value of under $1M. Tenant improvements to support relocation of t5 tenants (laxtec) to t5.5 and t6. at t5.5, fit out (e) empty office space on the mechanical level (level 4) to provide new conference room, offices, storage, it room and break area. at t6, provide new chainlink… Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address600 World Way, Los Angeles
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Permit issuedAugust 28, 2025
Stated construction valueunder $1M
Estimated stageComplete
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Tenant improvements to support relocation of t5 tenants (laxtec) to t5.5 and t6. at t5.5, fit out (e) empty office space on the mechanical level (level 4) to provide new conference room, offices, storage, it room and break area. at t6, provide new chainlink…”

Where this project is

  1. March 7, 2025Alteration: structural work · under $1M
  2. August 28, 2025Alteration: Office and Tenant Fit-Out · under $1M (this page)
  3. September 10, 2025Alteration: structural work · under $1M
  4. December 10, 2025Alteration: mechanical · under $1M
  5. December 31, 2025Alteration: structural work · under $1M
  6. September 15, 2026Alteration: demolition · under $1M
  7. September 2025Estimated construction start (estimate)
  8. March 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby: 5 more renovations within 1 km

  • 500 World WayAddition · over $250M · August 2026
  • 100-800 World WayAlteration · $100M to $250M · June 2026
  • 400 W World WayAlteration: structural work · $25M to $50M · November 2025
  • 380 World WayAlteration · $25M to $50M · March 2026
  • 200 World Way T212b010Alteration · $10M to $25M · January 2026

18 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

Builtie stages each project as it moves; the trades open on it change week to week.

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Los Angeles

All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 600 World Way?

Office and Tenant Fit-Out. Tenant improvements to support relocation of t5 tenants (laxtec) to t5.5 and t6. at t5.5, fit out (e) empty office space on the mechanical level (level 4) to provide new conference room, offices, storage, it room and break area. at t6, provide new chainlink…

When was the permit issued for 600 World Way?

August 28, 2025, by the City of Los Angeles.

Who is building 600 World Way?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 600 World Way need now?

It depends on the stage; Builtie tracks it.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.