622 El Medio Ave, Pacific Palisades: New single-family home After the 2025 Fire

New single-family home at 622 El Medio Ave, Pacific Palisades, after the January 2025 Palisades Fire: the City of Los Angeles issued the building permit on February 2, 2026 with a stated construction value of $500K to $1M, and the rebuild is with the structure going up (Builtie's estimate). Builtie tracks every Palisades rebuild permit, the stage of each build and the builder behind it.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The rebuild
| Address | 622 El Medio Ave, Pacific Palisades, Los Angeles, CA |
| City permit address | 622 N El Medio Ave |
| Rebuild | New single-family home |
| What the plans show | 2 storeys, accessory dwelling unit, pool or spa, fire sprinklers throughout |
| Rebuild track | Like-for-like rebuild (the City's expedited track under Emergency Executive Order 1) |
| Building permit issued | February 2, 2026 |
| Status | With the structure going up (Builtie's estimate) |
| Stated construction value | $500K to $1M |
| Builder named on the permits | Willow Group Inc The |
| Permits at this address since the fire | 5 |
The facts above are read from the City of Los Angeles building permits filed for 622 El Medio Ave since the January 2025 Palisades Fire. Owners and permit numbers are left out.
Permit timeline
| Issued | Permit | Status |
|---|---|---|
| February 2, 2026 | Grading | Issued |
| February 2, 2026 | Pool and spa | Issued |
| February 2, 2026 | New single-family home | Issued |
| May 28, 2026 | Repair or alteration: revision to an earlier permit | Issued |
| September 10, 2026 | Repair or alteration: revision to an earlier permit | Issued |
5 permits since February 2, 2026. A typical rebuild runs demolition and debris clearance, grading and retaining walls, the new building, then the pool and site work.
Where it stands
622 El Medio Ave is with the structure going up (Builtie's estimate).
At that stage these trades are inside their award window, the stretch of the build when the builder decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
Other rebuilds on El Medio Ave
- 536 El Medio Ave: New single-family home, framing
- 548 El Medio Ave: New garage, complete
- 614 El Medio Ave: New single-family home, interior trades
- 620 El Medio Ave: New accessory dwelling unit (ADU), interior trades
- 650 El Medio Ave: New single-family home, likely complete
- 654 El Medio Ave: New single-family home, complete
- 657 El Medio Ave: Home repair or alteration, finaled
- 660 El Medio Ave: New single-family home, framing
All of them: fire rebuilds on El Medio Ave. Every street: the Pacific Palisades fire rebuild tracker.
For contractors
Builtie tracks every Palisades rebuild permit as it is issued, estimates where each build stands, and names the builder behind it, so a trade can reach them while its part of the job is still open. The decision makers and their verified contacts are in Builtie.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 622 El Medio Ave, Pacific Palisades?
New single-family home (2 storeys, accessory dwelling unit, pool or spa, fire sprinklers throughout), permitted February 2, 2026 after the January 2025 Palisades Fire.
What is the status of the rebuild at 622 El Medio Ave?
It is with the structure going up (Builtie's estimate), read October 20, 2026.
Is 622 El Medio Ave a like-for-like rebuild?
Yes. The City marked its permit eligible for the expedited like-for-like track.
Who is building 622 El Medio Ave?
Willow Group Inc The is named on the permits. The decision makers and contacts are in Builtie.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.