63 Arbour Lake Co NW, Calgary: 4-Storey Apartment Building

4-Storey Apartment Building at 63 Arbour Lake Co NW, Calgary was permitted on April 16, 2026 with a stated construction value of $10M to $25M. The Ashford - 4-Storey 79-Unit Apartment. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 63 Arbour Lake Co NW, Calgary |
| Project | 4-Storey Apartment Building |
| Building type | Residential |
| Work | New building |
| Permit issued | April 16, 2026 |
| Stated construction value | $10M to $25M |
| Estimated stage | Foundation |
| Company named on the permit | Cove Properties Arbour Lake West 2 LP |
| Decision makers and contacts | In Builtie |
From the permit: “The Ashford - 4-Storey 79-Unit Apartment”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Calgary
- 577 Whiteridge Wy NE: School Renovation
- 5215 86 Av SE: Warehouse
- 1920 7 Av SE: Apartment Building
- 1205 110 Av NE: 2-Storey Retail Building
- 4330 16 St SW: School
All of them: construction projects in Calgary by address. Calgary's permits name the homebuilder more often than any other city Builtie covers, which makes it the shortest path from a permit to the company that awards the trades.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 63 Arbour Lake Co NW?
4-Storey Apartment Building. The Ashford - 4-Storey 79-Unit Apartment
When was the permit issued for 63 Arbour Lake Co NW?
April 16, 2026, by the City of Calgary.
Who is building 63 Arbour Lake Co NW?
Cove Properties Arbour Lake West 2 LP is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 63 Arbour Lake Co NW need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
