634 Enchanted Way, Pacific Palisades: New single-family home After the 2025 Fire

New single-family home at 634 Enchanted Way, Pacific Palisades, after the January 2025 Palisades Fire: the City of Los Angeles issued the building permit on July 29, 2026 with a stated construction value of $500K to $1M, and the rebuild is at the foundation stage (Builtie's estimate). Builtie tracks every Palisades rebuild permit, the stage of each build and the builder behind it.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The rebuild
| Address | 634 Enchanted Way, Pacific Palisades, Los Angeles, CA |
| City permit address | 634 N Enchanted Way |
| Rebuild | New single-family home |
| What the plans show | 1 storey, basement, attached garage, fire sprinklers throughout |
| Rebuild track | Like-for-like rebuild (the City's expedited track under Emergency Executive Order 1) |
| Building permit issued | July 29, 2026 |
| Status | At the foundation stage (Builtie's estimate) |
| Stated construction value | $500K to $1M |
| Builder named on the permits | Westside Build LLC |
| Permits at this address since the fire | 4 |
The facts above are read from the City of Los Angeles building permits filed for 634 Enchanted Way since the January 2025 Palisades Fire. Owners and permit numbers are left out.
Permit timeline
| Issued | Permit | Status |
|---|---|---|
| July 29, 2026 | Grading | Issued |
| July 29, 2026 | Retaining wall | Issued |
| July 29, 2026 | Retaining wall | Issued |
| July 29, 2026 | New single-family home | Issued |
4 permits since July 29, 2026. A typical rebuild runs demolition and debris clearance, grading and retaining walls, the new building, then the pool and site work.
Where it stands
634 Enchanted Way is at the foundation stage (Builtie's estimate).
At that stage these trades are inside their award window, the stretch of the build when the builder decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
Other rebuilds on Enchanted Way
- 620 Enchanted Way: New single-family home, likely complete
- 623-625 Enchanted Way: New single-family home with an ADU, permitted
- 662 Enchanted Way: New single-family home, foundation
- 668 Enchanted Way: New single-family home, framing
- 693 Enchanted Way: Addition: revision to an earlier permit, excavation
- 718 Enchanted Way: New single-family home, framing
- 742 Enchanted Way: New single-family home, likely complete
- 777 Enchanted Way: New single-family home with an ADU, foundation
All of them: fire rebuilds on Enchanted Way. Every street: the Pacific Palisades fire rebuild tracker.
For contractors
Builtie tracks every Palisades rebuild permit as it is issued, estimates where each build stands, and names the builder behind it, so a trade can reach them while its part of the job is still open. The decision makers and their verified contacts are in Builtie.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 634 Enchanted Way, Pacific Palisades?
New single-family home (1 storey, basement, attached garage, fire sprinklers throughout), permitted July 29, 2026 after the January 2025 Palisades Fire.
What is the status of the rebuild at 634 Enchanted Way?
It is at the foundation stage (Builtie's estimate), read October 20, 2026.
Is 634 Enchanted Way a like-for-like rebuild?
Yes. The City marked its permit eligible for the expedited like-for-like track.
Who is building 634 Enchanted Way?
Westside Build LLC is named on the permits. The decision makers and contacts are in Builtie.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.