65-21 Main Street, Queens, New York City: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 65-21 Main Street, Queens, New York City was permitted on June 17, 2026 with a stated construction value of $5M to $10M. Renovation and conversion of existing library space into office suites, removal of existing walls, finishes, none code compliant stairs and lighting. Installation of newly reconfigured walls, stairs, finishes and lighting, to accommodate the new layout. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 65-21 Main Street, Queens, New York City |
| Project | Office and Tenant Fit-Out |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | June 17, 2026 |
| Stated construction value | $5M to $10M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Renovation and conversion of existing library space into office suites, removal of existing walls, finishes, none code compliant stairs and lighting. Installation of newly reconfigured walls, stairs, finishes and lighting, to accommodate the new layout”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 200 Eastern Parkway, Brooklyn: Institutional Project Renovation
- 159-38 Harlem River Drive, Manhattan: Apartment Building Renovation
- 972 Dean Street, Brooklyn: Office and Tenant Fit-Out
- 85 Bricktown Way, Staten Island: Office and Tenant Fit-Out
- 131 West 129 Street, Manhattan: 6-Storey Apartment Building Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 65-21 Main Street, Queens?
Office and Tenant Fit-Out. Renovation and conversion of existing library space into office suites, removal of existing walls, finishes, none code compliant stairs and lighting. Installation of newly reconfigured walls, stairs, finishes and lighting, to accommodate the new layout
When was the permit issued for 65-21 Main Street, Queens?
June 17, 2026, by New York City.
Who is building 65-21 Main Street, Queens?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 65-21 Main Street, Queens need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
