65 Red Embers Pz NE, Calgary: Townhomes

Townhomes at 65 Red Embers Pz NE, Calgary was permitted on October 15, 2025 with a stated construction value of $10M to $25M. Streetside Redstone Square - B29. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 65 Red Embers Pz NE, Calgary |
| Project | Townhomes |
| Building type | Residential |
| Work | New building |
| Permit issued | October 15, 2025 |
| Stated construction value | $10M to $25M |
| Estimated stage | Foundation |
| Company named on the permit | Streetside Development |
| Decision makers and contacts | In Builtie |
From the permit: “Streetside Redstone Square - B29”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Calgary
- 1801 1 St SE: Apartment Building
- 99 Heartwood Gd SE: 4-Storey Apartment Building
- 280 Springborough Hl SW: 6-Storey Apartment Building
- 700 77 St SW: 2-Storey School Renovation
- 7810 Macleod Tr SE: 5-Storey Self-Storage Building
All of them: construction projects in Calgary by address. Calgary's permits name the homebuilder more often than any other city Builtie covers, which makes it the shortest path from a permit to the company that awards the trades.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 65 Red Embers Pz NE?
Townhomes. Streetside Redstone Square - B29
When was the permit issued for 65 Red Embers Pz NE?
October 15, 2025, by the City of Calgary.
Who is building 65 Red Embers Pz NE?
Streetside Development is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 65 Red Embers Pz NE need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.