662 Haverford Ave, Pacific Palisades: New accessory dwelling unit (ADU) After the 2025 Fire

New accessory dwelling unit (ADU) at 662 Haverford Ave, Pacific Palisades, after the January 2025 Palisades Fire: the City of Los Angeles issued the building permit on July 30, 2026 with a stated construction value of under $250K, and the rebuild is at the foundation stage (Builtie's estimate). Builtie tracks every Palisades rebuild permit, the stage of each build and the builder behind it.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The rebuild
| Address | 662 Haverford Ave, Pacific Palisades, Los Angeles, CA |
| City permit address | 662 N Haverford Ave |
| Rebuild | New accessory dwelling unit (ADU) |
| What the plans show | 2 storeys, accessory dwelling unit, fire sprinklers throughout |
| Rebuild track | Like-for-like rebuild (the City's expedited track under Emergency Executive Order 1) |
| Building permit issued | July 30, 2026 |
| Status | At the foundation stage (Builtie's estimate) |
| Stated construction value | under $250K |
| Builder named on the permits | Duke Development Inc |
| Permits at this address since the fire | 1 |
The facts above are read from the City of Los Angeles building permits filed for 662 Haverford Ave since the January 2025 Palisades Fire. Owners and permit numbers are left out.
Permit timeline
| Issued | Permit | Status |
|---|---|---|
| July 30, 2026 | New accessory dwelling unit (ADU) | Issued |
1 permit since July 30, 2026. A typical rebuild runs demolition and debris clearance, grading and retaining walls, the new building, then the pool and site work.
Where it stands
662 Haverford Ave is at the foundation stage (Builtie's estimate).
At that stage these trades are inside their award window, the stretch of the build when the builder decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
Other rebuilds on Haverford Ave
- 626 Haverford Ave: New single-family home, excavation
- 640 Haverford Ave: New single-family home, likely complete
- 641 Haverford Ave: New single-family home, framing
- 645 Haverford Ave: New single-family home, interior trades
- 646 Haverford Ave: New single-family home, foundation
- 660 Haverford Ave: New single-family home, interior trades
- 664 Haverford Ave: New single-family home with an ADU, foundation
- 670 Haverford Ave: New single-family home, finishing
All of them: fire rebuilds on Haverford Ave. Every street: the Pacific Palisades fire rebuild tracker.
For contractors
Builtie tracks every Palisades rebuild permit as it is issued, estimates where each build stands, and names the builder behind it, so a trade can reach them while its part of the job is still open. The decision makers and their verified contacts are in Builtie.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 662 Haverford Ave, Pacific Palisades?
New accessory dwelling unit (ADU) (2 storeys, accessory dwelling unit, fire sprinklers throughout), permitted July 30, 2026 after the January 2025 Palisades Fire.
What is the status of the rebuild at 662 Haverford Ave?
It is at the foundation stage (Builtie's estimate), read October 20, 2026.
Is 662 Haverford Ave a like-for-like rebuild?
Yes. The City marked its permit eligible for the expedited like-for-like track.
Who is building 662 Haverford Ave?
Duke Development Inc is named on the permits. The decision makers and contacts are in Builtie.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
