70 Woodington Ave, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 70 Woodington Ave, Toronto was permitted on February 9, 2026 with a stated construction value of under $1M. Proposed addition, interior alterations, and underpinning of an existing house to convert it into a fourplex. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 70 Woodington Ave, Toronto |
| Neighbourhood | Danforth |
| Project | Office and Tenant Fit-Out |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | February 9, 2026 |
| Housing units | 4 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposed addition, interior alterations, and underpinning of an existing house to convert it into a fourplex”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- February 9, 2026Small Residential Projects: Office and Tenant Fit-Out · under $1M (this page)
- February 9, 2026Mechanical: excavation and shoring
- February 12, 2026Plumbing: excavation and shoring
- February 12, 2026Drains and site services: excavation and shoring
- February 2026Estimated construction start (estimate)
- September 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 5 Knight StNew building · $1M to $5M · February 2026
- 1180 Danforth AveAddition or alteration: plumbing · $1M to $5M · June 2026
- 596 Milverton BlvdNew construction: demolition · $1M to $5M · June 2026
6 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Feb 2026 – Sep 2026 | Estimate |
| Fire Protection | Mar 2026 – May 2026 | Window passed (est.) |
| Signage and Wayfinding | May 2026 – Jul 2026 | Window passed (est.) |
| Insulation | Apr 2026 – May 2026 | Window passed (est.) |
| Drywall | Apr 2026 – May 2026 | Window passed (est.) |
| Low Voltage and Data | Apr 2026 – May 2026 | Window passed (est.) |
| Tile | Apr 2026 – Jun 2026 | Window passed (est.) |
| Cabinetry and Millwork | Apr 2026 – May 2026 | Window passed (est.) |
| Flooring | Apr 2026 – Jun 2026 | Window passed (est.) |
| Countertops | Apr 2026 – Jun 2026 | Window passed (est.) |
| Finish Carpentry | Apr 2026 – Jun 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (February 2026) to the estimated completion (September 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 200 Wolverleigh Blvd: Place of Worship Renovation
- 804 Danforth Ave: Mixed-Use Building Renovation
- 800 Greenwood Ave: School Renovation
- 1876 A Keele St: Residential Project
- 1876 B Keele St: Residential Project
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 70 Woodington Ave?
Office and Tenant Fit-Out. Proposed addition, interior alterations, and underpinning of an existing house to convert it into a fourplex
When was the permit issued for 70 Woodington Ave?
February 9, 2026, by the City of Toronto.
Who is building 70 Woodington Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 70 Woodington Ave need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.