756 Hartzell St, Pacific Palisades: New single-family home After the 2025 Fire

New single-family home at 756 Hartzell St, Pacific Palisades, after the January 2025 Palisades Fire: the City of Los Angeles issued the building permit on August 25, 2026 with a stated construction value of $250K to $500K, and the rebuild is at excavation and site work (Builtie's estimate). Builtie tracks every Palisades rebuild permit, the stage of each build and the builder behind it.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The rebuild
| Address | 756 Hartzell St, Pacific Palisades, Los Angeles, CA |
| City permit address | 756 N Hartzell St |
| Rebuild | New single-family home |
| What the plans show | 2 storeys, attached garage, fire sprinklers throughout |
| Rebuild track | Not like-for-like, so it went through the City's standard plan review |
| Building permit issued | August 25, 2026 |
| Status | At excavation and site work (Builtie's estimate) |
| Stated construction value | $250K to $500K |
| Builder named on the permits | Resolved in Builtie |
| Permits at this address since the fire | 2 |
The facts above are read from the City of Los Angeles building permits filed for 756 Hartzell St since the January 2025 Palisades Fire. Owners and permit numbers are left out.
Permit timeline
| Issued | Permit | Status |
|---|---|---|
| August 25, 2026 | New single-family home | Issued |
| August 25, 2026 | Grading | Issued |
2 permits since August 25, 2026. A typical rebuild runs demolition and debris clearance, grading and retaining walls, the new building, then the pool and site work.
Where it stands
756 Hartzell St is at excavation and site work (Builtie's estimate).
At that stage these trades are inside their award window, the stretch of the build when the builder decides who gets the work:
| Trade | Award window |
|---|---|
| Excavation and Site Work | Before construction starts |
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
Other rebuilds on Hartzell St
- 722 Hartzell St: New accessory dwelling unit (ADU), finishing
- 732 Hartzell St: New single-family home, likely complete
- 736 Hartzell St: New single-family home, interior trades
- 752 Hartzell St: New single-family home, framing
- 757 Hartzell St: New single-family home, interior trades
- 761 Hartzell St: New single-family home, framing
- 768 Hartzell St: New single-family home, finaled
- 773 Hartzell St: New single-family home, framing
All of them: fire rebuilds on Hartzell St. Every street: the Pacific Palisades fire rebuild tracker.
For contractors
Builtie tracks every Palisades rebuild permit as it is issued, estimates where each build stands, and names the builder behind it, so a trade can reach them while its part of the job is still open. The decision makers and their verified contacts are in Builtie.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 756 Hartzell St, Pacific Palisades?
New single-family home (2 storeys, attached garage, fire sprinklers throughout), permitted August 25, 2026 after the January 2025 Palisades Fire.
What is the status of the rebuild at 756 Hartzell St?
It is at excavation and site work (Builtie's estimate), read October 20, 2026.
Is 756 Hartzell St a like-for-like rebuild?
No. The City marked its permit ineligible for the like-for-like track, so the plans went through standard review.
Who is building 756 Hartzell St?
Builtie resolves the builder behind the permits and attaches a verified decision maker.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.