763 Deodara Drive, Altadena: Accessory dwelling unit (ADU) After the Eaton Fire

Accessory dwelling unit (ADU) at 763 Deodara Drive, Altadena, after the January 2025 Eaton Fire, permitted October 13, 2026. The plans show detached garage. It has its building permit and construction is next. Builtie follows every fire rebuild in Los Angeles, address by address.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The rebuild
| Address | 763 Deodara Drive, Altadena, CA |
| Fire | Eaton Fire, January 2025 |
| Permits from | unincorporated Los Angeles County |
| Rebuild | Accessory dwelling unit (ADU) |
| What the plans show | detached garage |
| Like-for-like | Yes, a like-for-like rebuild |
| Where it stands | Building permit issued |
| Application filed | August 23, 2025 |
| Building permit issued | October 13, 2026 |
| Stated construction value | $500K to $1M |
Read from the Los Angeles County's fire recovery records for 763 Deodara Drive. Owners, applicants and case numbers are left out.
Rebuild progress
| County rebuild progress | |
|---|---|
| ✓ | Rebuild application received |
| ✓ | Zoning review cleared |
| ✓ | Full building plans received |
| ✓ | Building plans approved |
| ✓ | Building permit issued (now) |
| Rebuild in construction | |
| Construction completed |
The County tracks every fire rebuild through these seven steps. 763 Deodara Drive is at step 5: building permit issued.
Trades being bought now
At this point in a rebuild these trades are inside their award window:
| Trade | Award window |
|---|---|
| Excavation and Site Work | Before construction starts |
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
Other rebuilds on Deodara Drive
- 641 Deodara Drive: Single-family home rebuild, under construction
- 657 Deodara Drive: Fire damage repair, under construction
- 705 Deodara Drive: Single-family home rebuild, plans in review
- 715 Deodara Drive: Single-family home rebuild, under construction
- 722 Deodara Drive: Single-family home rebuild, plans approved
- 730 Deodara Drive: Single-family home rebuild, under construction
- 738 Deodara Drive: Accessory dwelling unit (ADU), plans in review
- 760 Deodara Drive: Single-family home rebuild, plans approved
All of them: fire rebuilds on Deodara Drive, Altadena. The whole area: the Altadena and Pasadena Eaton Fire rebuild tracker.
For contractors
Builtie follows the fire rebuilds across Los Angeles, from Pacific Palisades to Altadena, and shows a trade which rebuilds are at the point where its work is bought. Where a permit names the builder, Builtie attaches the decision makers and their verified contacts.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being rebuilt at 763 Deodara Drive, Altadena?
Accessory dwelling unit (ADU) (detached garage), after the Eaton Fire of January 2025.
What is the status of the rebuild at 763 Deodara Drive?
Building permit issued, read October 20, 2026.
Is 763 Deodara Drive a like-for-like rebuild?
Yes, it is filed as like-for-like.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.