79 Robert St, Toronto: Accessory Dwelling Unit Renovation
Follow this project · we email you when its status or build stage changes

Accessory Dwelling Unit Renovation at 79 Robert St, Toronto was permitted on March 11, 2026 with a stated construction value of under $1M. Renovation or addition to an accessory dwelling unit. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 79 Robert St, Toronto |
| Neighbourhood | University |
| Project | Accessory Dwelling Unit Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | March 11, 2026 |
| Housing units | 1 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in Toronto once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- September 27, 2024Small Residential Projects: addition · under $1M
- March 11, 2026Small Residential Projects: Accessory Dwelling Unit Renovation · under $1M (this page)
- March 11, 2026Drains and site services
- March 11, 2026Plumbing
- March 2026Estimated construction start (estimate)
- October 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 300 Bloor St WNew building · $100M to $250M · July 2026
- 150 College StAddition or alteration: demolition · $25M to $50M · May 2026
- 399 Bathurst StAddition or alteration: excavation and shoring · $10M to $25M · November 2025
- 6 Spadina RdAddition or alteration · $10M to $25M · April 2026
- 610 University AveAddition or alteration: interior alteration · $5M to $10M · June 2026
25 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Mar 2026 – Oct 2026 | Estimate |
| Fire Protection | Apr 2026 – Jun 2026 | Window passed (est.) |
| Signage and Wayfinding | Jun 2026 – Aug 2026 | Window passed (est.) |
| Insulation | May 2026 – Jun 2026 | Window passed (est.) |
| Drywall | May 2026 – Jun 2026 | Window passed (est.) |
| Low Voltage and Data | May 2026 – Jun 2026 | Window passed (est.) |
| Tile | May 2026 – Jul 2026 | Window passed (est.) |
| Cabinetry and Millwork | May 2026 – Jun 2026 | Window passed (est.) |
| Flooring | May 2026 – Jul 2026 | Window passed (est.) |
| Countertops | May 2026 – Jul 2026 | Window passed (est.) |
| Finish Carpentry | May 2026 – Jul 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (March 2026) to the estimated completion (October 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in Toronto
Leads for your trade: every trade in Toronto.
More projects: every Toronto project of $1M+ by address · major projects in Toronto.
Compare tools: The Best Construction Lead Generation Software in Ontario.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 77 Robert St: Accessory Dwelling Unit Renovation
- 30 Brunswick Ave: Accessory Dwelling Unit Renovation
- 63 Major St: Single-Family House Renovation
- 100 Queen's Park: Institutional Project Renovation
- 130-140 St George St: Campus Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 79 Robert St?
Accessory Dwelling Unit Renovation. Renovation or addition to an accessory dwelling unit.
When was the permit issued for 79 Robert St?
March 11, 2026, by the City of Toronto.
Who is building 79 Robert St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 79 Robert St need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.