80 Erskine Place, Bronx, New York City: Parking Structure Renovation

Parking Structure Renovation at 80 Erskine Place, Bronx, New York City was permitted on July 20, 2026 with a stated construction value of $1M to $5M. Herewith filing for general construction and structural repairs to this existing parking garage. No change to use, occupancy or egress. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 80 Erskine Place, Bronx, New York City |
| Project | Parking Structure Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | July 20, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Herewith filing for general construction and structural repairs to this existing parking garage. No change to use, occupancy or egress”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 1044 Boynton Avenue, Bronx: Apartment Building Renovation
- 3250 Broadway, Manhattan: 20-Storey Apartment Building Renovation
- 545 West 126 Street, Manhattan: 20-Storey Apartment Building Renovation
- 132 4 Avenue, Manhattan: Apartment Building Renovation
- 1075 Park Avenue, Manhattan: Apartment Building Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 80 Erskine Place, Bronx?
Parking Structure Renovation. Herewith filing for general construction and structural repairs to this existing parking garage. No change to use, occupancy or egress
When was the permit issued for 80 Erskine Place, Bronx?
July 20, 2026, by New York City.
Who is building 80 Erskine Place, Bronx?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 80 Erskine Place, Bronx need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.