800 W Martin Luther King Jr Blvd, Los Angeles: Commercial Project Renovation

Commercial Project Renovation at 800 W Martin Luther King Jr Blvd, Los Angeles was permitted on November 6, 2025 with a stated construction value of $5M to $10M. **ePlan**** Change of Use for portion of the building from Public Garage to Automobile Sales and a new rooftop show room structure atop the existing building six floor; add a new elevator on the east side of the existing building. New architectural facade… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 800 W Martin Luther King Jr Blvd, Los Angeles |
| Project | Commercial Project Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | November 6, 2025 |
| Stated construction value | $5M to $10M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “**ePlan**** Change of Use for portion of the building from Public Garage to Automobile Sales and a new rooftop show room structure atop the existing building six floor; add a new elevator on the east side of the existing building. New architectural facade…”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Los Angeles
- 1013 N Sycamore Ave: Office and Tenant Fit-Out
- 11099 S La Cienega Blvd: Warehouse Renovation
- 12100 W Olympic Blvd: Office and Tenant Fit-Out
- 14701 W Friar St: 2-Storey School Renovation
- 15350 W Sherman Way: 4-Storey Self-Storage Building Renovation
All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Pasadena, Glendale, Burbank, Long Beach and the rest of Los Angeles County issue their own permits and are not in the feed today. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 800 W Martin Luther King Jr Blvd?
Commercial Project Renovation. **ePlan**** Change of Use for portion of the building from Public Garage to Automobile Sales and a new rooftop show room structure atop the existing building six floor; add a new elevator on the east side of the existing building. New architectural facade…
When was the permit issued for 800 W Martin Luther King Jr Blvd?
November 6, 2025, by the City of Los Angeles.
Who is building 800 W Martin Luther King Jr Blvd?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 800 W Martin Luther King Jr Blvd need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
