805-807 S 6th Ave, Los Angeles: 2-Storey Single-Family House
Follow this project · we email you when its status or build stage changes

2-Storey Single-Family House at 805-807 S 6th Ave, Los Angeles was permitted on June 19, 2026 with a stated construction value of $1M to $5M. New single-family house, 2 storeys. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 805-807 S 6th Ave, Los Angeles |
| Project | 2-Storey Single-Family House |
| Building type | Residential |
| Work | New building |
| Storeys | 2 |
| Permit issued | June 19, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Excavation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in Los Angeles once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- June 19, 2026New home: 2-Storey Single-Family House · $1M to $5M (this page)
- July 2026Estimated construction start (estimate)
- July 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 13 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 250 S 6th AveNew building · $1M to $5M · December 2025
- 1114 S Abbot Kinney BlvdInterior alteration · $1M to $5M · April 2026
2 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 1 to approach now, 8 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jul 2026 – Jul 2027 | Estimate |
| Excavation and Site Work | Jun 2026 – Jul 2026 | Window passed (est.) |
| Construction Site Security | Jun 2026 – Sep 2026 | Window passed (est.) |
| Concrete and Foundation | Jul 2026 – Aug 2026 | Window passed (est.) |
| Structural Steel | Jul 2026 – Sep 2026 | Window passed (est.) |
| Elevators | Jul 2026 – Sep 2026 | Window passed (est.) |
| Framing | Jul 2026 – Sep 2026 | Window passed (est.) |
| Painting | Aug 2026 – Nov 2026 | Approach now |
| Masonry | Jul 2026 – Sep 2026 | Window passed (est.) |
| Waterproofing | Jul 2026 – Sep 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (July 2026) to the estimated completion (July 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in Los Angeles
Leads for your trade: Painting leads in Los Angeles · every trade in Los Angeles.
More projects: every Los Angeles project of $1M+ by address · major projects in Los Angeles.
Compare tools: The Best Construction Lead Generation Software in California.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Los Angeles
- 9200 S Firth Blvd: Apartment Building
- 4622 W Melbourne Ave: 3-Storey Duplex
- 101 S The Grove Dr G7 & G8: Office and Tenant Fit-Out
- 1999 S Avenue Of The Stars Floor 36: Commercial Project Renovation
- 1733 N Doheny Dr: 1-Storey Single-Family House
All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 805-807 S 6th Ave?
2-Storey Single-Family House. New single-family house, 2 storeys.
When was the permit issued for 805-807 S 6th Ave?
June 19, 2026, by the City of Los Angeles.
Who is building 805-807 S 6th Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 805-807 S 6th Ave need now?
Estimated as of October 2026, the trades to approach now are painting. Already passed: excavation and site work; site security; concrete; structural steel; elevator; framing; masonry; waterproofing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
