99 Park Avenue, Manhattan, New York City: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 25, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 99 Park Avenue, Manhattan, New York City was filed with New York City on August 12, 2026 with a stated construction value of $1M to $5M; the city has not approved it yet (DOB status: Plan Examiner Review). No change in use, occupancy or means of egress. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address99 Park Avenue, Manhattan, New York City
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Filed with the cityAugust 12, 2026
City statusNot yet approved (DOB status: Plan Examiner Review)
Stated construction value$1M to $5M
Estimated stageFoundation
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “No change in use, occupancy or means of egress”

Where this project is

  1. Since April 202615 other permits at this address
  2. May 26, 2026Interior alteration · $1M to $5M
  3. June 1, 2026Interior alteration · $1M to $5M
  4. July 13, 2026Alteration · $1M to $5M
  5. August 12, 2026Alteration: Office and Tenant Fit-Out · $1M to $5M (this page)
  6. August 14, 2026Alteration: fire protection · under $1M
  7. August 25, 2026Alteration: mechanical · under $1M
  8. September 2026Estimated construction start (estimate)
  9. September 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 13 months for a job this size). It is not the builder's schedule.

Other big projects nearby

170 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 9 to approach now, 1 passed.

TradeWhen to approach (est.)Status
Construction (est.)Sep 2026 – Sep 2027Estimate
Construction Site SecurityAug 2026 – Nov 2026Approach now
Concrete and FoundationAug 2026 – Sep 2026Window passed (est.)
Structural SteelSep 2026 – Nov 2026Approach now
ElevatorsSep 2026 – Nov 2026Approach now
FramingSep 2026 – Nov 2026Approach now
PaintingSep 2026 – Jan 2027Approach now
MasonrySep 2026 – Nov 2026Approach now
WaterproofingSep 2026 – Nov 2026Approach now
RoofingOct 2026 – Dec 2026Approach now
Windows, Doors and GlazingSep 2026 – Dec 2026Approach now

How we estimate: each bar is the share of the build, from the estimated start (September 2026) to the estimated completion (September 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 99 Park Avenue, Manhattan?

Office and Tenant Fit-Out. No change in use, occupancy or means of egress

Has 99 Park Avenue, Manhattan been permitted?

Not yet. The work was filed with New York City on August 12, 2026; the city has not approved it yet (DOB status: Plan Examiner Review).

Who is building 99 Park Avenue, Manhattan?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 99 Park Avenue, Manhattan need now?

Estimated as of October 2026, the trades to approach now are site security; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing. Already passed: concrete.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.