1 New York Plaza, Manhattan, New York City: Retail Building Renovation

Commercial building under construction with a tower crane
Figures read October 25, 2026 from Builtie's permit data.

Retail Building Renovation at 1 New York Plaza, Manhattan, New York City was permitted on July 28, 2026 with a stated construction value of under $1M. No change in use, egress, or occupancy. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address1 New York Plaza, Manhattan, New York City
ProjectRetail Building Renovation
Building typeCommercial
WorkRenovation or alteration
Permit issuedJuly 28, 2026
Stated construction valueunder $1M
Estimated stageExcavation
Company named on the permitSummit Interiors, Inc. See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “No change in use, egress, or occupancy”

Where this project is

  1. Since March 20261 other permit at this building
  2. March 24, 2026Alteration: site protection · under $1M · filed as 1 Water Street, Manhattan
  3. May 13, 2026Alteration · under $1M
  4. July 28, 2026Alteration: Retail Building Renovation · under $1M (this page)
  5. July 28, 2026Alteration: mechanical · under $1M
  6. July 28, 2026Alteration: plumbing · under $1M
  7. July 28, 2026Alteration: fire protection · under $1M
  8. August 2026Estimated construction start (estimate)
  9. February 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

49 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Summit Interiors, Inc. has 5 other projects in Builtie

  • New York City · Alteration: demolition · under $1M · 2026
  • New York City · Alteration · under $1M · 2026
  • New York · Mechanical · 2026

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 1 to approach now, 8 passed.

TradeWhen to approach (est.)Status
Construction (est.)Aug 2026 – Feb 2027Estimate
Excavation and Site WorkJul 2026 – Aug 2026Window passed (est.)
Construction Site SecurityJul 2026 – Sep 2026Window passed (est.)
Concrete and FoundationAug 2026Window passed (est.)
Structural SteelAug 2026 – Sep 2026Window passed (est.)
ElevatorsAug 2026 – Sep 2026Window passed (est.)
FramingAug 2026 – Sep 2026Window passed (est.)
PaintingAug 2026 – Oct 2026Approach now
MasonryAug 2026 – Sep 2026Window passed (est.)
WaterproofingAug 2026 – Sep 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (August 2026) to the estimated completion (February 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 1 New York Plaza, Manhattan?

Retail Building Renovation. No change in use, egress, or occupancy

When was the permit issued for 1 New York Plaza, Manhattan?

July 28, 2026, by New York City.

Who is building 1 New York Plaza, Manhattan?

Summit Interiors, Inc. is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 1 New York Plaza, Manhattan need now?

Estimated as of October 2026, the trades to approach now are painting. Already passed: excavation and site work; site security; concrete; structural steel; elevator; framing; masonry; waterproofing.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.