100 West 33 Street, Manhattan, New York City: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 100 West 33 Street, Manhattan, New York City was permitted on April 22, 2026 with a stated construction value of under $1M. Construction of non-load bearing 2-hour partitions and openingn protectives to enclose new proposed place of assembly. change in floor occupant load from 852 to 689 people. place of assembly and tenant fit-out applications to be filed separately. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 100 West 33 Street, Manhattan, New York City |
| Project | Office and Tenant Fit-Out |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | April 22, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Construction of non-load bearing 2-hour partitions and openingn protectives to enclose new proposed place of assembly. change in floor occupant load from 852 to 689 people. place of assembly and tenant fit-out applications to be filed separately”
Get new $1M+ projects in New York City every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since April 202611 other permits at this address
- April 22, 2026Alteration CO: Office and Tenant Fit-Out · under $1M (this page)
- August 4, 2026Interior alteration · under $1M
- September 24, 2026Alteration: mechanical · $1M to $5M
- September 30, 2026Interior alteration · $5M to $10M
- September 30, 2026Alteration: fire protection · under $1M
- October 2, 2026Alteration: structural work · under $1M
- May 2026Estimated construction start (estimate)
- November 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 4 more conversions within 1 km
- 592 7 Avenue, ManhattanAlteration CO: conversion to residential · $100M to $250M · July 2026
- 371 Seventh Avenue, ManhattanAlteration CO: interior alteration · $50M to $100M · October 2026
- 6 East 43 Street, ManhattanAlteration CO: conversion to residential · $50M to $100M · September 2026
- 2 Penn Plaza, ManhattanInterior alteration · $25M to $50M · July 2026
- 522 5 Avenue, ManhattanAlteration CO: elevator · $25M to $50M · June 2026
138 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | May 2026 – Nov 2026 | Estimate |
| Construction Site Security | May 2026 – Jun 2026 | Window passed (est.) |
| Concrete and Foundation | May 2026 | Window passed (est.) |
| Structural Steel | May 2026 – Jun 2026 | Window passed (est.) |
| Elevators | May 2026 – Jun 2026 | Window passed (est.) |
| Framing | May 2026 – Jun 2026 | Window passed (est.) |
| Painting | May 2026 – Jul 2026 | Window passed (est.) |
| Masonry | May 2026 – Jun 2026 | Window passed (est.) |
| Waterproofing | May 2026 – Jun 2026 | Window passed (est.) |
| Roofing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Windows, Doors and Glazing | May 2026 – Jul 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (May 2026) to the estimated completion (November 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 2476 Jerome Avenue, Bronx: Transit Facility Renovation
- 1377 Rockaway Parkway, Brooklyn: Transit Facility Renovation
- 235 Sackett Street, Brooklyn: Apartment Building Renovation
- 97-16 Northern Boulevard, Queens: Mixed-Use Building Renovation
- 129 Montague Street, Brooklyn: Office and Tenant Fit-Out
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 100 West 33 Street, Manhattan?
Office and Tenant Fit-Out. Construction of non-load bearing 2-hour partitions and openingn protectives to enclose new proposed place of assembly. change in floor occupant load from 852 to 689 people. place of assembly and tenant fit-out applications to be filed separately
When was the permit issued for 100 West 33 Street, Manhattan?
April 22, 2026, by New York City.
Who is building 100 West 33 Street, Manhattan?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 100 West 33 Street, Manhattan need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.