97-16 Northern Boulevard, Queens, New York City: Mixed-Use Building Renovation

Mixed-Use Building Renovation at 97-16 Northern Boulevard, Queens, New York City was permitted on October 13, 2026 with a stated construction value of under $1M. Alt -1 filing to change existing c f o to propose a mixed use building with adding a 4th. floor. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 97-16 Northern Boulevard, Queens, New York City |
| Project | Mixed-Use Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | October 13, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Permit |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Alt -1 filing to change existing c f o to propose a mixed use building with adding a 4th. floor”
Get new $1M+ projects in New York City every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- October 13, 2026Alteration CO: Mixed-Use Building Renovation · under $1M (this page)
- November 2026Estimated construction start (estimate)
- May 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 94-18 34 Avenue, QueensNew building · $25M to $50M · July 2026
- 35-11 Junction Boulevard, QueensNew construction · $1M to $5M · October 2026
- 33-25 Junction Boulevard, QueensNew building · $1M to $5M · May 2026
- 97-08 Astoria Boulevard, QueensAlteration CO: interior alteration · $1M to $5M · October 2026
4 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 2 to approach now, 5 coming up.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Nov 2026 – May 2027 | Estimate |
| Excavation and Site Work | Oct 2026 – Nov 2026 | Approach now |
| Construction Site Security | Oct 2026 – Dec 2026 | Approach now |
| Concrete and Foundation | Nov 2026 | Coming up |
| Structural Steel | Nov 2026 – Dec 2026 | Coming up |
| Elevators | Nov 2026 – Dec 2026 | Coming up |
| Framing | Nov 2026 – Dec 2026 | Coming up |
| Painting | Nov 2026 – Jan 2027 | Coming up |
How we estimate: each bar is the share of the build, from the estimated start (November 2026) to the estimated completion (May 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 129 Montague Street, Brooklyn: Office and Tenant Fit-Out
- 2476 Jerome Avenue, Bronx: Transit Facility Renovation
- 1377 Rockaway Parkway, Brooklyn: Transit Facility Renovation
- 100 West 33 Street, Manhattan: Office and Tenant Fit-Out
- 235 Sackett Street, Brooklyn: Apartment Building Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 97-16 Northern Boulevard, Queens?
Mixed-Use Building Renovation. Alt -1 filing to change existing c f o to propose a mixed use building with adding a 4th. floor
When was the permit issued for 97-16 Northern Boulevard, Queens?
October 13, 2026, by New York City.
Who is building 97-16 Northern Boulevard, Queens?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 97-16 Northern Boulevard, Queens need now?
Estimated as of October 2026, the trades to approach now are excavation and site work; site security. Coming up: concrete from November 2026, structural steel from November 2026, elevator from November 2026, framing from November 2026 and painting from November 2026.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.