1023 Galloway St, Pacific Palisades: New single-family home After the 2025 Fire

New single-family home at 1023 Galloway St, Pacific Palisades, after the January 2025 Palisades Fire: the City of Los Angeles issued the building permit on June 11, 2025 with a stated construction value of $500K to $1M, and the rebuild is with the mechanical, electrical and interior trades at work (Builtie's estimate). Builtie tracks every Palisades rebuild permit, the stage of each build and the builder behind it.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The rebuild
| Address | 1023 Galloway St, Pacific Palisades, Los Angeles, CA |
| City permit address | 1023 N Galloway St |
| Rebuild | New single-family home |
| What the plans show | 2 storeys, attached garage, fire sprinklers throughout |
| Rebuild track | Like-for-like rebuild (the City's expedited track under Emergency Executive Order 1) |
| Building permit issued | June 11, 2025 |
| Status | With the mechanical, electrical and interior trades at work (Builtie's estimate) |
| Stated construction value | $500K to $1M |
| Builder named on the permits | Socal Construction Management Inc |
| Permits at this address since the fire | 2 |
The facts above are read from the City of Los Angeles building permits filed for 1023 Galloway St since the January 2025 Palisades Fire. Owners and permit numbers are left out.
Permit timeline
| Issued | Permit | Status |
|---|---|---|
| June 11, 2025 | New single-family home | Issued |
| September 29, 2025 | Addition: revision to an earlier permit | Issued |
2 permits since June 11, 2025. A typical rebuild runs demolition and debris clearance, grading and retaining walls, the new building, then the pool and site work.
Where it stands
1023 Galloway St is with the mechanical, electrical and interior trades at work (Builtie's estimate).
At that stage these trades are inside their award window, the stretch of the build when the builder decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
Other rebuilds on Galloway St
- 1000 Galloway St: New single-family home, interior trades
- 1018 Galloway St: New single-family home, framing
- 1026 Galloway St: New single-family home, permitted
- 1039 Galloway St: New single-family home, interior trades
- 1043 Galloway St: New single-family home, finaled
- 1046 Galloway St: New single-family home, likely complete
- 1047 Galloway St: New single-family home, framing
- 1050 Galloway St: New single-family home, likely complete
All of them: fire rebuilds on Galloway St. Every street: the Pacific Palisades fire rebuild tracker.
For contractors
Builtie tracks every Palisades rebuild permit as it is issued, estimates where each build stands, and names the builder behind it, so a trade can reach them while its part of the job is still open. The decision makers and their verified contacts are in Builtie.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1023 Galloway St, Pacific Palisades?
New single-family home (2 storeys, attached garage, fire sprinklers throughout), permitted June 11, 2025 after the January 2025 Palisades Fire.
What is the status of the rebuild at 1023 Galloway St?
It is with the mechanical, electrical and interior trades at work (Builtie's estimate), read October 20, 2026.
Is 1023 Galloway St a like-for-like rebuild?
Yes. The City marked its permit eligible for the expedited like-for-like track.
Who is building 1023 Galloway St?
Socal Construction Management Inc is named on the permits. The decision makers and contacts are in Builtie.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
