1040 6 Avenue, Manhattan, New York City: Retail Building Renovation
Follow this project · we email you when its status or build stage changes

Retail Building Renovation at 1040 6 Avenue, Manhattan, New York City was filed with New York City on August 14, 2026 with a stated construction value of under $1M; the city has not approved it yet (DOB status: Plan Examiner Review). Interior renovation of an existing retail store. no change of use, occupancy or egress under this application. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1040 6 Avenue, Manhattan, New York City |
| Project | Retail Building Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Filed with the city | August 14, 2026 |
| City status | Not yet approved (DOB status: Plan Examiner Review) |
| Stated construction value | under $1M |
| Estimated stage | Excavation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Interior renovation of an existing retail store. no change of use, occupancy or egress under this application”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in New York City once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since February 20261 other permit at this building
- February 27, 2026Alteration: demolition · under $1M · filed as 1040 Avenue Of The Americas, Manhattan
- March 1, 2026Alteration: demolition · under $1M · filed as 1040 Avenue Of The Americas, Manhattan
- August 6, 2026Alteration: fire protection · under $1M
- August 6, 2026Alteration: plumbing · under $1M
- August 14, 2026Alteration: Retail Building Renovation · under $1M (this page)
- September 2, 2026Alteration: mechanical · under $1M
- August 2026Estimated construction start (estimate)
- March 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 375 Madison Avenue, ManhattanAlteration: facade work · $100M to $250M · July 2026
- 592 7 Avenue, ManhattanAlteration CO: conversion to residential · $100M to $250M · July 2026
- 10 Rockefeller Plaza, ManhattanAlteration CO · $50M to $100M · July 2026
- 371 Seventh Avenue, ManhattanAlteration CO: interior alteration · $50M to $100M · October 2026
- 6 East 43 Street, ManhattanAlteration CO: conversion to residential · $50M to $100M · September 2026
170 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 3 to approach now, 6 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Aug 2026 – Mar 2027 | Estimate |
| Excavation and Site Work | Aug 2026 | Window passed (est.) |
| Construction Site Security | Aug 2026 – Sep 2026 | Window passed (est.) |
| Concrete and Foundation | Aug 2026 – Sep 2026 | Window passed (est.) |
| Structural Steel | Aug 2026 – Sep 2026 | Window passed (est.) |
| Elevators | Aug 2026 – Oct 2026 | Approach now |
| Framing | Aug 2026 – Oct 2026 | Approach now |
| Painting | Sep 2026 – Nov 2026 | Approach now |
| Masonry | Aug 2026 – Sep 2026 | Window passed (est.) |
| Waterproofing | Aug 2026 – Sep 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (August 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in New York City
Leads for your trade: Elevators leads in New York City · Framing leads in New York City · Painting leads in New York City · every trade in New York City.
More projects: every New York City project of $1M+ by address · major projects in New York City.
Compare tools: The Best Construction Lead Generation Software in New York.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 250 West 57 Street, Manhattan: Retail Building Renovation
- 48 East 81 Street, Manhattan: Single-Family House Renovation
- 50-06 215 Street, Queens: Single-Family House Renovation
- 31 Osborne Street, Staten Island: Single-Family House Renovation
- 697 Halsey Street, Brooklyn: Two-Family House Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1040 6 Avenue, Manhattan?
Retail Building Renovation. Interior renovation of an existing retail store. no change of use, occupancy or egress under this application
Has 1040 6 Avenue, Manhattan been permitted?
Not yet. The work was filed with New York City on August 14, 2026; the city has not approved it yet (DOB status: Plan Examiner Review).
Who is building 1040 6 Avenue, Manhattan?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 1040 6 Avenue, Manhattan need now?
Estimated as of October 2026, the trades to approach now are elevator, framing and painting. Already passed: excavation and site work; site security; concrete; structural steel; masonry; waterproofing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.