10453 W Sandal Lane, Los Angeles: 1-Storey Single-Family House

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

1-Storey Single-Family House at 10453 W Sandal Lane, Los Angeles was permitted on April 22, 2025 with a stated construction value of under $1M. New single-family house, 1 storey. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address10453 W Sandal Lane, Los Angeles
Project1-Storey Single-Family House
Building typeResidential
WorkNew building
Storeys1
Permit issuedApril 22, 2025
Stated construction valueunder $1M
Estimated stageSub-trades
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. Since April 20252 other permits at this address
  2. April 22, 2025New home: 1-Storey Single-Family House · under $1M (this page)
  3. April 22, 2025Pool · under $1M
  4. April 22, 2025New construction · under $1M
  5. April 22, 2025Grading · under $1M
  6. September 15, 2025Alteration: electrical · under $1M
  7. January 28, 2026Alteration · under $1M
  8. May 2025Estimated construction start (estimate)
  9. November 2025Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)May 2025 – Nov 2025Estimate
Fire ProtectionJun 2025 – Jul 2025Window passed (est.)
Signage and WayfindingAug 2025 – Sep 2025Window passed (est.)
InsulationJun 2025 – Aug 2025Window passed (est.)
DrywallJul 2025 – Aug 2025Window passed (est.)
Low Voltage and DataJul 2025 – Aug 2025Window passed (est.)
TileJul 2025 – Aug 2025Window passed (est.)
Cabinetry and MillworkJul 2025 – Aug 2025Window passed (est.)
FlooringJul 2025 – Aug 2025Window passed (est.)
CountertopsJul 2025 – Aug 2025Window passed (est.)
Finish CarpentryJul 2025 – Aug 2025Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (May 2025) to the estimated completion (November 2025) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Los Angeles

All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 10453 W Sandal Lane?

1-Storey Single-Family House. New single-family house, 1 storey.

When was the permit issued for 10453 W Sandal Lane?

April 22, 2025, by the City of Los Angeles.

Who is building 10453 W Sandal Lane?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 10453 W Sandal Lane need now?

Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.