1056 Iliff St, Pacific Palisades: New single-family home After the 2025 Fire

New single-family home at 1056 Iliff St, Pacific Palisades, after the January 2025 Palisades Fire: the City of Los Angeles issued the building permit on June 12, 2025 with a stated construction value of $500K to $1M, and the rebuild is with the mechanical, electrical and interior trades at work (Builtie's estimate). Builtie tracks every Palisades rebuild permit, the stage of each build and the builder behind it.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The rebuild
| Address | 1056 Iliff St, Pacific Palisades, Los Angeles, CA |
| City permit address | 1056 N Iliff St |
| Rebuild | New single-family home |
| What the plans show | 2 storeys, basement, attached garage, pool or spa, fire sprinklers throughout |
| Building permit issued | June 12, 2025 |
| Status | With the mechanical, electrical and interior trades at work (Builtie's estimate) |
| Stated construction value | $500K to $1M |
| Builder named on the permits | Southland Building & Remodel Company |
| Permits at this address since the fire | 7 |
The facts above are read from the City of Los Angeles building permits filed for 1056 Iliff St since the January 2025 Palisades Fire. Owners and permit numbers are left out.
Permit timeline
| Issued | Permit | Status |
|---|---|---|
| June 12, 2025 | Temporary shoring | Issued |
| June 12, 2025 | New single-family home | Issued |
| June 12, 2025 | Grading | Issued |
| July 7, 2025 | Site structure repair: revision to an earlier permit | Issued |
| October 20, 2025 | Pool and spa: revision to an earlier permit | Issued |
| November 12, 2025 | Pool and spa: revision to an earlier permit | Issued |
| May 7, 2026 | Repair or alteration: revision to an earlier permit | Issued |
7 permits since June 12, 2025. A typical rebuild runs demolition and debris clearance, grading and retaining walls, the new building, then the pool and site work.
Where it stands
1056 Iliff St is with the mechanical, electrical and interior trades at work (Builtie's estimate).
At that stage these trades are inside their award window, the stretch of the build when the builder decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
Other rebuilds on Iliff St
- 1010 Iliff St: New single-family home, framing
- 1017 Iliff St: New single-family home, interior trades
- 1027 Iliff St: New single-family home, framing
- 1041 Iliff St: New single-family home, framing
- 1044 Iliff St: New accessory dwelling unit (ADU), likely complete
- 1046 Iliff St: New single-family home, likely complete
- 1050 Iliff St: New single-family home, complete
- 1057 Iliff St: New single-family home, foundation
All of them: fire rebuilds on Iliff St. Every street: the Pacific Palisades fire rebuild tracker.
For contractors
Builtie tracks every Palisades rebuild permit as it is issued, estimates where each build stands, and names the builder behind it, so a trade can reach them while its part of the job is still open. The decision makers and their verified contacts are in Builtie.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1056 Iliff St, Pacific Palisades?
New single-family home (2 storeys, basement, attached garage, pool or spa, fire sprinklers throughout), permitted June 12, 2025 after the January 2025 Palisades Fire.
What is the status of the rebuild at 1056 Iliff St?
It is with the mechanical, electrical and interior trades at work (Builtie's estimate), read October 20, 2026.
Who is building 1056 Iliff St?
Southland Building & Remodel Company is named on the permits. The decision makers and contacts are in Builtie.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
