11 West 69 Street, Manhattan, New York City: Apartment Building Renovation
Follow this project · we email you when its status or build stage changes

Apartment Building Renovation at 11 West 69 Street, Manhattan, New York City was permitted on July 24, 2026 with a stated construction value of under $1M. Gas infrastructure restoration, installation of new master meter in cellar, and installation of appliance and lock-wing valves at all stoves in apartments. no change in egress or occupancy. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 11 West 69 Street, Manhattan, New York City |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | July 24, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | H & D Maintenance Co Inc. See the decision makers — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Gas infrastructure restoration, installation of new master meter in cellar, and installation of appliance and lock-wing valves at all stoves in apartments. no change in egress or occupancy”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in New York City once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- March 24, 2026Interior alteration · under $1M
- March 26, 2026Alteration: site protection · under $1M
- May 27, 2026Alteration · under $1M
- July 24, 2026Alteration · under $1M
- July 24, 2026Alteration: Apartment Building Renovation · under $1M (this page)
- April 2026Estimated construction start (estimate)
- October 2026Estimated completion (estimate)
How we estimate: from the same company's first permit at this address (March 2026) and this permit's stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 170 Central Park West, ManhattanAlteration CO: addition · $25M to $50M · August 2026
- 10 Columbus Circle, ManhattanAlteration CO: interior alteration · $10M to $25M · June 2026
- 77 West 66 Street, ManhattanDemolition · $10M to $25M · March 2026
- 1980 Broadway, ManhattanAlteration CO: interior alteration · $10M to $25M · September 2026
- 47 West 66 Street, ManhattanDemolition · $5M to $10M · April 2026
55 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →
H & D Maintenance Co Inc. has 4 other projects in Builtie
- New York City · Alteration: elevator · under $1M · 2026
- New York · General Construction · 2026
- New York · General Construction · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Apr 2026 – Oct 2026 | Estimate |
| Construction Site Security | Mar 2026 – May 2026 | Window passed (est.) |
| Concrete and Foundation | Mar 2026 – Apr 2026 | Window passed (est.) |
| Structural Steel | Apr 2026 – May 2026 | Window passed (est.) |
| Elevators | Apr 2026 – May 2026 | Window passed (est.) |
| Framing | Apr 2026 – May 2026 | Window passed (est.) |
| Painting | Apr 2026 – Jun 2026 | Window passed (est.) |
| Masonry | Apr 2026 – May 2026 | Window passed (est.) |
| Waterproofing | Apr 2026 – May 2026 | Window passed (est.) |
| Roofing | Apr 2026 – Jun 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Apr 2026 – May 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (April 2026) to the estimated completion (October 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in New York City
Leads for your trade: every trade in New York City.
More projects: every New York City project of $1M+ by address · major projects in New York City.
Compare tools: The Best Construction Lead Generation Software in New York.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 643 West 43 Street, Manhattan: Parking Structure Renovation
- 77 Park Avenue, Manhattan: Apartment Building Renovation
- 184 Webster Avenue, Brooklyn: Single-Family House Renovation
- 413 1 Street, Brooklyn: Duplex Renovation
- 4 East 74 Street, Manhattan: Single-Family House Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 11 West 69 Street, Manhattan?
Apartment Building Renovation. Gas infrastructure restoration, installation of new master meter in cellar, and installation of appliance and lock-wing valves at all stoves in apartments. no change in egress or occupancy
When was the permit issued for 11 West 69 Street, Manhattan?
July 24, 2026, by New York City.
Who is building 11 West 69 Street, Manhattan?
H & D Maintenance Co Inc. is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 11 West 69 Street, Manhattan need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.