643 West 43 Street, Manhattan, New York City: Parking Structure Renovation

Commercial building under construction with a tower crane
Figures read October 25, 2026 from Builtie's permit data.

Parking Structure Renovation at 643 West 43 Street, Manhattan, New York City was permitted on August 31, 2026 with a stated construction value of under $1M. Herewith filing for Structural and General Construction repairs to this existing parking garage including temporary structural shoring. No change to use, occupancy or egress. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address643 West 43 Street, Manhattan, New York City
ProjectParking Structure Renovation
Building typeCommercial
WorkRenovation or alteration
Permit issuedAugust 31, 2026
Stated construction valueunder $1M
Estimated stageExcavation
Company named on the permitO&s Associates, Inc. See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Herewith filing for Structural and General Construction repairs to this existing parking garage including temporary structural shoring. No change to use, occupancy or egress”

Where this project is

  1. March 2, 2026Alteration: foundation · under $1M
  2. August 31, 2026Alteration: Parking Structure Renovation · under $1M (this page)
  3. September 2026Estimated construction start (estimate)
  4. March 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 495 11 Avenue, ManhattanNew building · over $250M · March 2026
  • 514 West 36 Street, ManhattanNew construction: structural work · $50M to $100M · August 2026
  • 755 12 Avenue, ManhattanAlteration CO: interior alteration · $50M to $100M · June 2026
  • 20 Hudson Yards, ManhattanInterior alteration · $50M to $100M · July 2026
  • 50 Hudson Yards, ManhattanAlteration · $10M to $25M · May 2026

32 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

O&s Associates, Inc. has 11 other projects in Builtie

  • New York City · Alteration: structural work · $1M to $5M · 2026
  • New York City · Alteration: structural work · $1M to $5M · 2026
  • New York City · Alteration: structural work · $1M to $5M · 2026

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 7 to approach now, 2 passed.

TradeWhen to approach (est.)Status
Construction (est.)Sep 2026 – Mar 2027Estimate
Excavation and Site WorkAug 2026 – Sep 2026Window passed (est.)
Construction Site SecurityAug 2026 – Oct 2026Approach now
Concrete and FoundationSep 2026Window passed (est.)
Structural SteelSep 2026 – Oct 2026Approach now
ElevatorsSep 2026 – Oct 2026Approach now
FramingSep 2026 – Oct 2026Approach now
PaintingSep 2026 – Nov 2026Approach now
MasonrySep 2026 – Oct 2026Approach now
WaterproofingSep 2026 – Oct 2026Approach now

How we estimate: each bar is the share of the build, from the estimated start (September 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 643 West 43 Street, Manhattan?

Parking Structure Renovation. Herewith filing for Structural and General Construction repairs to this existing parking garage including temporary structural shoring. No change to use, occupancy or egress

When was the permit issued for 643 West 43 Street, Manhattan?

August 31, 2026, by New York City.

Who is building 643 West 43 Street, Manhattan?

O&s Associates, Inc. is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 643 West 43 Street, Manhattan need now?

Estimated as of October 2026, the trades to approach now are site security, structural steel, elevator, framing, painting, masonry and waterproofing. Already passed: excavation and site work; concrete.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.