1117 Iliff St, Pacific Palisades: New single-family home After the 2025 Fire

New single-family home at 1117 Iliff St, Pacific Palisades, after the January 2025 Palisades Fire: the City of Los Angeles issued the building permit on January 29, 2026 with a stated construction value of under $250K, and the rebuild is with the mechanical, electrical and interior trades at work (Builtie's estimate). Builtie tracks every Palisades rebuild permit, the stage of each build and the builder behind it.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The rebuild
| Address | 1117 Iliff St, Pacific Palisades, Los Angeles, CA |
| City permit address | 1117 N Iliff St |
| Rebuild | New single-family home |
| What the plans show | detached garage, fire sprinklers throughout |
| Rebuild track | Like-for-like rebuild (the City's expedited track under Emergency Executive Order 1) |
| Building permit issued | January 29, 2026 |
| Status | With the mechanical, electrical and interior trades at work (Builtie's estimate) |
| Stated construction value | under $250K |
| Builder named on the permits | Resolved in Builtie |
| Permits at this address since the fire | 7 |
The facts above are read from the City of Los Angeles building permits filed for 1117 Iliff St since the January 2025 Palisades Fire. Owners and permit numbers are left out.
Permit timeline
| Issued | Permit | Status |
|---|---|---|
| January 29, 2026 | Retaining wall | Issued |
| January 29, 2026 | Grading | Issued |
| January 29, 2026 | New garage | Issued |
| January 29, 2026 | New single-family home | Issued |
| March 11, 2026 | Site structure repair: revision to an earlier permit | Issued |
| May 26, 2026 | Repair or alteration: revision to an earlier permit | Issued |
| May 26, 2026 | Repair or alteration: revision to an earlier permit | Issued |
7 permits since January 29, 2026. A typical rebuild runs demolition and debris clearance, grading and retaining walls, the new building, then the pool and site work.
Where it stands
1117 Iliff St is with the mechanical, electrical and interior trades at work (Builtie's estimate).
At that stage these trades are inside their award window, the stretch of the build when the builder decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
Other rebuilds on Iliff St
- 1107 Iliff St: New single-family home, likely complete
- 1118 Iliff St: New single-family home, framing
- 1122-1124 Iliff St: Repair or alteration: revision to an earlier permit, framing
- 1124 Iliff St: New single-family home with an ADU, interior trades
- 1130 Iliff St: New single-family home, likely complete
- 1134 Iliff St: New single-family home, permitted
- 1143 Iliff St: New single-family home, finishing
- 1144 Iliff St: New single-family home, interior trades
All of them: fire rebuilds on Iliff St. Every street: the Pacific Palisades fire rebuild tracker.
For contractors
Builtie tracks every Palisades rebuild permit as it is issued, estimates where each build stands, and names the builder behind it, so a trade can reach them while its part of the job is still open. The decision makers and their verified contacts are in Builtie.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1117 Iliff St, Pacific Palisades?
New single-family home (detached garage, fire sprinklers throughout), permitted January 29, 2026 after the January 2025 Palisades Fire.
What is the status of the rebuild at 1117 Iliff St?
It is with the mechanical, electrical and interior trades at work (Builtie's estimate), read October 20, 2026.
Is 1117 Iliff St a like-for-like rebuild?
Yes. The City marked its permit eligible for the expedited like-for-like track.
Who is building 1117 Iliff St?
Builtie resolves the builder behind the permits and attaches a verified decision maker.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
