131-72 40 Road, Queens, New York City: Office and Tenant Fit-Out
Follow this project · we email you when its status or build stage changes

Office and Tenant Fit-Out at 131-72 40 Road, Queens, New York City was filed with New York City on September 10, 2026 with a stated construction value of under $1M; the city has not approved it yet (DOB status: Objections). Interior Renovation of existing office area at 5th Floor. Work includes removal and installation of non-load bearing partitions, doors, finishes and fixtures. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 131-72 40 Road, Queens, New York City |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Filed with the city | September 10, 2026 |
| City status | Not yet approved (DOB status: Objections) |
| Stated construction value | under $1M |
| Estimated stage | Excavation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Interior Renovation of existing office area at 5th Floor. Work includes removal and installation of non-load bearing partitions, doors, finishes and fixtures”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in New York City once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- June 5, 2026Alteration · under $1M
- June 5, 2026Alteration · under $1M
- June 5, 2026Alteration · under $1M
- September 10, 2026Alteration: Office and Tenant Fit-Out · under $1M (this page)
- September 29, 2026Alteration: mechanical · under $1M
- June 2026Estimated construction start (estimate)
- January 2027Estimated completion (estimate)
How we estimate: from the same company's first permit at this address (June 2026) and this permit's stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 4 more renovations within 1 km
- 121-09 Roosevelt Avenue, QueensAlteration: excavation and shoring · $100M to $250M · October 2026
- 126-43 39 Avenue, QueensNew building · $25M to $50M · October 2026
- 131-07 40 Road, QueensInterior alteration · $10M to $25M · April 2026
- 41 Seaver Way, QueensAlteration · $10M to $25M · September 2026
- 131-04 Meridian Road, QueensAlteration · $1M to $5M · July 2026
22 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jun 2026 – Jan 2027 | Estimate |
| Excavation and Site Work | May 2026 – Jun 2026 | Window passed (est.) |
| Construction Site Security | May 2026 – Jul 2026 | Window passed (est.) |
| Concrete and Foundation | Jun 2026 | Window passed (est.) |
| Structural Steel | Jun 2026 – Jul 2026 | Window passed (est.) |
| Elevators | Jun 2026 – Jul 2026 | Window passed (est.) |
| Framing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Painting | Jun 2026 – Aug 2026 | Window passed (est.) |
| Masonry | Jun 2026 – Jul 2026 | Window passed (est.) |
| Waterproofing | Jun 2026 – Jul 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (January 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in New York City
Leads for your trade: every trade in New York City.
More projects: every New York City project of $1M+ by address · major projects in New York City.
Compare tools: The Best Construction Lead Generation Software in New York.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 494 Humboldt Street, Brooklyn: Two-Family House Renovation
- 2479 Amsterdam Avenue, Manhattan: Parking Structure Renovation
- 326 Leonard Street, Brooklyn: Single-Family House Renovation
- 112 Bay 10 Street, Brooklyn: Single-Family House Renovation
- 1-75 Beach 101 Street, Queens: Single-Family House Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 131-72 40 Road, Queens?
Office and Tenant Fit-Out. Interior Renovation of existing office area at 5th Floor. Work includes removal and installation of non-load bearing partitions, doors, finishes and fixtures
Has 131-72 40 Road, Queens been permitted?
Not yet. The work was filed with New York City on September 10, 2026; the city has not approved it yet (DOB status: Objections).
Who is building 131-72 40 Road, Queens?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 131-72 40 Road, Queens need now?
Estimated from the permit date, the award windows for excavation and site work; site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.