132-29 Pople Avenue, Queens, New York City: 5-Storey Mixed-Use Building

Residential development under construction with tower cranes on the skyline
Figures read October 24, 2026 from Builtie's permit data.

5-Storey Mixed-Use Building at 132-29 Pople Avenue, Queens, New York City was permitted on October 21, 2026 with a stated construction value of $1M to $5M. New 5-story mixed-use building. obtain a new certificate of occupancy. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address132-29 Pople Avenue, Queens, New York City
Project5-Storey Mixed-Use Building
Building typeResidential
WorkNew building
Permit issuedOctober 21, 2026
Stated construction value$1M to $5M
Estimated stagePermit
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “New 5-story mixed-use building. obtain a new certificate of occupancy”

Where this project is

  1. October 21, 2026New construction: 5-Storey Mixed-Use Building · $1M to $5M (this page)
  2. November 2026Estimated construction start (estimate)
  3. November 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 13 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 126-43 39 Avenue, QueensNew building · $25M to $50M · October 2026
  • 137-23 45 Avenue, QueensAlteration · $10M to $25M · July 2026
  • 131-07 40 Road, QueensInterior alteration · $10M to $25M · April 2026
  • 56-45 Main Street, QueensAlteration: mechanical · $1M to $5M · August 2026
  • 131-04 Meridian Road, QueensAlteration · $1M to $5M · July 2026

17 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

The company behind this project has 11 other projects in Builtie

  • New York City · Alteration CO: interior alteration · under $1M · 2026
  • New York City · Alteration CO: conversion to residential · under $1M · 2026
  • New York City · Alteration: site protection · under $1M · 2026

Reveal the builder — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 2 to approach now, 5 coming up.

TradeWhen to approach (est.)Status
Construction (est.)Nov 2026 – Nov 2027Estimate
Excavation and Site WorkOct 2026 – Nov 2026Approach now
Construction Site SecurityOct 2026 – Jan 2027Approach now
Concrete and FoundationNov 2026 – Dec 2026Coming up
Structural SteelNov 2026 – Jan 2027Coming up
ElevatorsNov 2026 – Feb 2027Coming up
FramingNov 2026 – Feb 2027Coming up
PaintingDec 2026 – Mar 2027Coming up

How we estimate: each bar is the share of the build, from the estimated start (November 2026) to the estimated completion (November 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 132-29 Pople Avenue, Queens?

5-Storey Mixed-Use Building. New 5-story mixed-use building. obtain a new certificate of occupancy

When was the permit issued for 132-29 Pople Avenue, Queens?

October 21, 2026, by New York City.

Who is building 132-29 Pople Avenue, Queens?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 132-29 Pople Avenue, Queens need now?

Estimated as of October 2026, the trades to approach now are excavation and site work; site security. Coming up: concrete from November 2026, structural steel from November 2026, elevator from November 2026, framing from November 2026 and painting from December 2026.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.