1323 Elder Avenue, Bronx, New York City: 2-Storey Apartment Building Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 25, 2026 from Builtie's permit data.

2-Storey Apartment Building Renovation at 1323 Elder Avenue, Bronx, New York City was permitted on May 12, 2026 with a stated construction value of under $1M. Existing 2 story and basement, 3-Family to be converted into a 8-unit building. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address1323 Elder Avenue, Bronx, New York City
Project2-Storey Apartment Building Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedMay 12, 2026
Stated construction valueunder $1M
Estimated stageFraming
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Existing 2 story and basement, 3-Family to be converted into a 8-unit building”

Where this project is

  1. March 12, 2026Alteration CO · under $1M
  2. May 12, 2026Alteration CO: 2-Storey Apartment Building Renovation · under $1M (this page)
  3. May 2026Estimated construction start (estimate)
  4. December 2026Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

30 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)May 2026 – Dec 2026Estimate
Construction Site SecurityMay 2026 – Jun 2026Window passed (est.)
PaintingJun 2026 – Aug 2026Window passed (est.)
MasonryMay 2026 – Jun 2026Window passed (est.)
WaterproofingMay 2026 – Jun 2026Window passed (est.)
RoofingJun 2026 – Jul 2026Window passed (est.)
Windows, Doors and GlazingJun 2026 – Jul 2026Window passed (est.)
ElectricalJun 2026 – Aug 2026Window passed (est.)
HVAC and MechanicalJun 2026 – Aug 2026Window passed (est.)
PlumbingJun 2026 – Aug 2026Window passed (est.)
Fire ProtectionJun 2026 – Aug 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (May 2026) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 1323 Elder Avenue, Bronx?

2-Storey Apartment Building Renovation. Existing 2 story and basement, 3-Family to be converted into a 8-unit building

When was the permit issued for 1323 Elder Avenue, Bronx?

May 12, 2026, by New York City.

Who is building 1323 Elder Avenue, Bronx?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 1323 Elder Avenue, Bronx need now?

Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.