150 52 Street, Brooklyn, New York City: Office and Tenant Fit-Out
Follow this project · we email you when its status or build stage changes

Office and Tenant Fit-Out at 150 52 Street, Brooklyn, New York City was filed with New York City on August 3, 2026 with a stated construction value of under $1M; the city has not approved it yet (DOB status: Objections). Tenant improvement work for a space located on the ground floor. proposed work includes new interior partitions, ceilings, flooring, millwork and related services as shown on submitted plans. no change in occupancy, use or egress. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 150 52 Street, Brooklyn, New York City |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Filed with the city | August 3, 2026 |
| City status | Not yet approved (DOB status: Objections) |
| Stated construction value | under $1M |
| Estimated stage | Excavation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Tenant improvement work for a space located on the ground floor. proposed work includes new interior partitions, ceilings, flooring, millwork and related services as shown on submitted plans. no change in occupancy, use or egress”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in New York City once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since August 20263 other permits at this address
- August 3, 2026Alteration: Office and Tenant Fit-Out · under $1M (this page)
- August 14, 2026Alteration: mechanical · under $1M
- August 14, 2026Alteration: fire protection · under $1M
- August 14, 2026Alteration: plumbing · under $1M
- August 18, 2026Alteration · under $1M
- September 1, 2026Alteration CO · under $1M
- August 2026Estimated construction start (estimate)
- March 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 115 55 Street, BrooklynNew construction: foundation · $100M to $250M · September 2026
- 140a 58 Street, BrooklynAlteration: elevator · $25M to $50M · March 2026
- 111 Longshore, BrooklynAlteration CO: interior alteration · $5M to $10M · July 2026
- 156 56 Street, BrooklynAlteration CO · $1M to $5M · October 2026
- 150 55 Street, BrooklynAlteration · $1M to $5M · March 2026
9 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 1 to approach now, 8 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Aug 2026 – Mar 2027 | Estimate |
| Excavation and Site Work | Jul 2026 – Aug 2026 | Window passed (est.) |
| Construction Site Security | Jul 2026 – Sep 2026 | Window passed (est.) |
| Concrete and Foundation | Aug 2026 | Window passed (est.) |
| Structural Steel | Aug 2026 – Sep 2026 | Window passed (est.) |
| Elevators | Aug 2026 – Sep 2026 | Window passed (est.) |
| Framing | Aug 2026 – Sep 2026 | Window passed (est.) |
| Painting | Aug 2026 – Oct 2026 | Approach now |
| Masonry | Aug 2026 – Sep 2026 | Window passed (est.) |
| Waterproofing | Aug 2026 – Sep 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (August 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in New York City
Leads for your trade: Painting leads in New York City · every trade in New York City.
More projects: every New York City project of $1M+ by address · major projects in New York City.
Compare tools: The Best Construction Lead Generation Software in New York.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 81-19 169 Street, Queens: Single-Family House Renovation
- 5661 Riverdale Avenue, Bronx: Retail Building Renovation
- 1386 Union Street, Brooklyn: Single-Family House Renovation
- 541 Barclay Avenue, Staten Island: Single-Family House Renovation
- 234-19 Seward Avenue, Queens: Single-Family House Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 150 52 Street, Brooklyn?
Office and Tenant Fit-Out. Tenant improvement work for a space located on the ground floor. proposed work includes new interior partitions, ceilings, flooring, millwork and related services as shown on submitted plans. no change in occupancy, use or egress
Has 150 52 Street, Brooklyn been permitted?
Not yet. The work was filed with New York City on August 3, 2026; the city has not approved it yet (DOB status: Objections).
Who is building 150 52 Street, Brooklyn?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 150 52 Street, Brooklyn need now?
Estimated as of October 2026, the trades to approach now are painting. Already passed: excavation and site work; site security; concrete; structural steel; elevator; framing; masonry; waterproofing.