159 West 54 Street, Manhattan, New York City: Apartment Building Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 25, 2026 from Builtie's permit data.

Apartment Building Renovation at 159 West 54 Street, Manhattan, New York City was permitted on June 18, 2026 with a stated construction value of under $1M. PLUMBING RENOVATION (NEW AND RELOCATED BATHROOMS), NEW DISHWASHER AND WASHER, NEW KITCHEN SINK. IN NEW APARTMENTS 2nd Floor (apt 201-A, 201-B and 201-C), 8th Floor, (apt 803-A and 803-B) 10 Floor (apt 1002-A and 1002-B), 11 Floor (apt 1102-A and 1102-B). Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address159 West 54 Street, Manhattan, New York City
ProjectApartment Building Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedJune 18, 2026
Stated construction valueunder $1M
Estimated stageFoundation
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “PLUMBING RENOVATION (NEW AND RELOCATED BATHROOMS), NEW DISHWASHER AND WASHER, NEW KITCHEN SINK. IN NEW APARTMENTS 2nd Floor (apt 201-A, 201-B and 201-C), 8th Floor, (apt 803-A and 803-B) 10 Floor (apt 1002-A and 1002-B), 11 Floor (apt 1102-A and 1102-B)”

Where this project is

  1. Since May 20261 other permit at this building
  2. June 2, 2026Alteration CO · under $1M
  3. June 16, 2026Alteration CO: plumbing · under $1M
  4. June 18, 2026Alteration: Apartment Building Renovation · under $1M (this page)
  5. June 29, 2026Interior alteration · under $1M · filed as 843 7 Avenue, Manhattan
  6. August 4, 2026Interior alteration · under $1M · filed as 843 7 Avenue, Manhattan
  7. August 5, 2026Alteration: plumbing · under $1M · filed as 843 7 Avenue, Manhattan
  8. June 2026Estimated construction start (estimate)
  9. January 2027Estimated completion (estimate)

How we estimate: from the same company's first permit at this building (June 2026) and this permit's stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

186 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

The company behind this project has 6 other projects in Builtie

  • New York City · Alteration CO · under $1M · 2026
  • New York City · Alteration · under $1M · 2026
  • New York · General Construction · 2026

Reveal the builder — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Jun 2026 – Jan 2027Estimate
Construction Site SecurityMay 2026 – Jul 2026Window passed (est.)
Concrete and FoundationJun 2026Window passed (est.)
Structural SteelJun 2026 – Jul 2026Window passed (est.)
ElevatorsJun 2026 – Jul 2026Window passed (est.)
FramingJun 2026 – Jul 2026Window passed (est.)
PaintingJun 2026 – Aug 2026Window passed (est.)
MasonryJun 2026 – Jul 2026Window passed (est.)
WaterproofingJun 2026 – Jul 2026Window passed (est.)
RoofingJul 2026 – Aug 2026Window passed (est.)
Windows, Doors and GlazingJun 2026 – Aug 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (January 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 159 West 54 Street, Manhattan?

Apartment Building Renovation. PLUMBING RENOVATION (NEW AND RELOCATED BATHROOMS), NEW DISHWASHER AND WASHER, NEW KITCHEN SINK. IN NEW APARTMENTS 2nd Floor (apt 201-A, 201-B and 201-C), 8th Floor, (apt 803-A and 803-B) 10 Floor (apt 1002-A and 1002-B), 11 Floor (apt 1102-A and 1102-B)

When was the permit issued for 159 West 54 Street, Manhattan?

June 18, 2026, by New York City.

Who is building 159 West 54 Street, Manhattan?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 159 West 54 Street, Manhattan need now?

Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.