4221 Hylan Boulevard, Staten Island, New York City: Retail Building Renovation

Commercial building under construction with a tower crane
Figures read October 25, 2026 from Builtie's permit data.

Retail Building Renovation at 4221 Hylan Boulevard, Staten Island, New York City was filed with New York City on August 20, 2026 with a stated construction value of under $1M; the city has not approved it yet (DOB status: Plan Examiner Review). Interior renovations to existing eating and drinking establishment. New kitchen, bar, toilets and dinning layout including new wall, floors and ceiling finishes. Exterior facade renovation including new store front windows and doors. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address4221 Hylan Boulevard, Staten Island, New York City
ProjectRetail Building Renovation
Building typeCommercial
WorkRenovation or alteration
Filed with the cityAugust 20, 2026
City statusNot yet approved (DOB status: Plan Examiner Review)
Stated construction valueunder $1M
Estimated stageExcavation
Company named on the permitPanacea Contracting Corp See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Interior renovations to existing eating and drinking establishment. New kitchen, bar, toilets and dinning layout including new wall, floors and ceiling finishes. Exterior facade renovation including new store front windows and doors”

Where this project is

  1. May 6, 2026Alteration: plumbing · under $1M
  2. July 9, 2026Alteration: plumbing · under $1M
  3. August 20, 2026Alteration: Retail Building Renovation · under $1M (this page)
  4. September 8, 2026Alteration: roofing · under $1M
  5. May 2026Estimated construction start (estimate)
  6. December 2026Estimated completion (estimate)

How we estimate: from the same company's first permit at this address (May 2026) and this permit's stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Panacea Contracting Corp has 2 other projects in Builtie

  • New York · Construction fence · 2026
  • New York · General Construction · 2026

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)May 2026 – Dec 2026Estimate
Excavation and Site WorkApr 2026 – May 2026Window passed (est.)
Construction Site SecurityApr 2026 – Jun 2026Window passed (est.)
Concrete and FoundationMay 2026Window passed (est.)
Structural SteelMay 2026 – Jun 2026Window passed (est.)
ElevatorsMay 2026 – Jun 2026Window passed (est.)
FramingMay 2026 – Jun 2026Window passed (est.)
PaintingMay 2026 – Jul 2026Window passed (est.)
MasonryMay 2026 – Jun 2026Window passed (est.)
WaterproofingMay 2026 – Jun 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (May 2026) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 4221 Hylan Boulevard, Staten Island?

Retail Building Renovation. Interior renovations to existing eating and drinking establishment. New kitchen, bar, toilets and dinning layout including new wall, floors and ceiling finishes. Exterior facade renovation including new store front windows and doors

Has 4221 Hylan Boulevard, Staten Island been permitted?

Not yet. The work was filed with New York City on August 20, 2026; the city has not approved it yet (DOB status: Plan Examiner Review).

Who is building 4221 Hylan Boulevard, Staten Island?

Panacea Contracting Corp is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 4221 Hylan Boulevard, Staten Island need now?

Estimated from the permit date, the award windows for excavation and site work; site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.