17 Battery Place, Manhattan, New York City: Office-to-Residential Conversion

Office-to-Residential Conversion at 17 Battery Place, Manhattan, New York City was permitted on August 4, 2026 with a stated construction value of $5M to $10M. General construction associated with conversion of 11th-13th floors to residential use. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 17 Battery Place, Manhattan, New York City |
| Project | Office-to-Residential Conversion |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | August 4, 2026 |
| Stated construction value | $5M to $10M |
| Estimated stage | Permit |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “General construction associated with conversion of 11th-13th floors to residential use”
Which trades are being bought now
The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Excavation and Site Work | Before construction starts |
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 86-53 Grand Avenue, Queens: 5-Storey Transit Facility
- 212 Broadway, Manhattan: Warehouse Renovation
- 34-42 Leavitt Street, Queens: Residential Project Renovation
- 750 Rockaway Avenue, Brooklyn: 5-Storey Affordable Housing Renovation
- 43-25 52 Street, Queens: 9-Storey Apartment Building
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 17 Battery Place, Manhattan?
Office-to-Residential Conversion. General construction associated with conversion of 11th-13th floors to residential use
When was the permit issued for 17 Battery Place, Manhattan?
August 4, 2026, by New York City.
Who is building 17 Battery Place, Manhattan?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 17 Battery Place, Manhattan need now?
At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.