1850 80 St SW, Calgary: Apartment Building

Apartment Building at 1850 80 St SW, Calgary was permitted on November 12, 2025 with a stated construction value of $10M to $25M. Aspen village - building 01. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1850 80 St SW, Calgary |
| Project | Apartment Building |
| Building type | Residential |
| Work | New building |
| Permit issued | November 12, 2025 |
| Stated construction value | $10M to $25M |
| Estimated stage | Foundation |
| Company named on the permit | Vesta Properties Aspen |
| Decision makers and contacts | In Builtie |
From the permit: “Aspen village - building 01”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Calgary
- 375 Collegiate Bv NW: 2-Storey School
- 131 Dr Carpenter Ci NW: School Renovation
- 1205 110 Av NE: 2-Storey Retail Building
- 4330 16 St SW: School
- 1920 7 Av SE: Apartment Building
All of them: construction projects in Calgary by address. Calgary's permits name the homebuilder more often than any other city Builtie covers, which makes it the shortest path from a permit to the company that awards the trades.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1850 80 St SW?
Apartment Building. Aspen village - building 01
When was the permit issued for 1850 80 St SW?
November 12, 2025, by the City of Calgary.
Who is building 1850 80 St SW?
Vesta Properties Aspen is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 1850 80 St SW need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
