190 St George St, Toronto: Apartment Building Renovation

Apartment Building Renovation at 190 St George St, Toronto was permitted on August 26, 2025 with a stated construction value of under $1M. Proposal for balcony concrete repairs. Localized concrete repair = 405 m2, concrete balustrade replacement = 60 m. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 190 St George St, Toronto |
| Neighbourhood | Annex |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | August 26, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Lakeridge Contracting Ltd. |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for balcony concrete repairs. Localized concrete repair = 405 m2, concrete balustrade replacement = 60 m”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since July 20001 other permit at this address
- July 25, 2000Non-Residential Building Permit: interior alteration · under $1M
- January 6, 2017Addition or alteration: interior alteration · under $1M
- May 2, 2018Addition or alteration: conversion to residential
- May 17, 2018Plumbing: conversion to residential
- November 20, 2018Addition or alteration: interior alteration · under $1M
- August 26, 2025Addition or alteration: Apartment Building Renovation · under $1M (this page)
- September 2025Estimated construction start (estimate)
- March 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 4 more renovations within 1 km
- 300 Bloor St WNew building · $100M to $250M · July 2026
- 6 Spadina RdAddition or alteration · $10M to $25M · April 2026
- 61 Yorkville AveAddition or alteration: interior alteration · $5M to $10M · November 2025
- 263 Dupont StAddition or alteration · $5M to $10M · May 2026
- 252 Bloor St WAddition or alteration: interior alteration · $1M to $5M · February 2026
21 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Sep 2025 – Mar 2026 | Estimate |
| Fire Protection | Oct 2025 – Nov 2025 | Window passed (est.) |
| Signage and Wayfinding | Dec 2025 – Jan 2026 | Window passed (est.) |
| Insulation | Oct 2025 – Dec 2025 | Window passed (est.) |
| Drywall | Nov 2025 – Dec 2025 | Window passed (est.) |
| Low Voltage and Data | Nov 2025 – Dec 2025 | Window passed (est.) |
| Tile | Nov 2025 – Dec 2025 | Window passed (est.) |
| Cabinetry and Millwork | Nov 2025 – Dec 2025 | Window passed (est.) |
| Flooring | Nov 2025 – Dec 2025 | Window passed (est.) |
| Countertops | Nov 2025 – Dec 2025 | Window passed (est.) |
| Finish Carpentry | Nov 2025 – Dec 2025 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (September 2025) to the estimated completion (March 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 122 Avenue Rd: Office and Tenant Fit-Out
- 316 Dupont St: Office and Tenant Fit-Out
- 118 Yorkville Ave: Office and Tenant Fit-Out
- 500 Dupont St: Restaurant Renovation
- 83 Yorkville Ave: Retail Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 190 St George St?
Apartment Building Renovation. Proposal for balcony concrete repairs. Localized concrete repair = 405 m2, concrete balustrade replacement = 60 m
When was the permit issued for 190 St George St?
August 26, 2025, by the City of Toronto.
Who is building 190 St George St?
Lakeridge Contracting Ltd. is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 190 St George St need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.