1946 1/2 S Manning Ave, Los Angeles: 4-Storey Single-Family House

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

4-Storey Single-Family House at 1946 1/2 S Manning Ave, Los Angeles was permitted on October 3, 2025 with a stated construction value of under $1M. New single-family house, 4 storeys. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address1946 1/2 S Manning Ave, Los Angeles
Project4-Storey Single-Family House
Building typeResidential
WorkNew building
Storeys4
Permit issuedOctober 3, 2025
Stated construction valueunder $1M
Estimated stageSub-trades
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. October 3, 2025New home: 4-Storey Single-Family House · under $1M (this page)
  2. October 2025Estimated construction start (estimate)
  3. May 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby: 4 more new buildings within 1 km

4 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–4, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Oct 2025 – May 2026Estimate
Fire ProtectionNov 2025 – Dec 2025Window passed (est.)
Signage and WayfindingJan 2026 – Feb 2026Window passed (est.)
InsulationNov 2025 – Jan 2026Window passed (est.)
DrywallDec 2025 – Jan 2026Window passed (est.)
Low Voltage and DataDec 2025 – Jan 2026Window passed (est.)
TileDec 2025 – Jan 2026Window passed (est.)
Cabinetry and MillworkDec 2025 – Jan 2026Window passed (est.)
FlooringDec 2025 – Jan 2026Window passed (est.)
CountertopsDec 2025 – Jan 2026Window passed (est.)
Finish CarpentryDec 2025 – Jan 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (October 2025) to the estimated completion (May 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Los Angeles

All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 1946 1/2 S Manning Ave?

4-Storey Single-Family House. New single-family house, 4 storeys.

When was the permit issued for 1946 1/2 S Manning Ave?

October 3, 2025, by the City of Los Angeles.

Who is building 1946 1/2 S Manning Ave?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 1946 1/2 S Manning Ave need now?

Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.