200 Chambers Street, Manhattan, New York City: Apartment Building Renovation
Follow this project · we email you when its status or build stage changes

Apartment Building Renovation at 200 Chambers Street, Manhattan, New York City was permitted on September 25, 2026 with a stated construction value of under $1M. Replace existing a.c units, duct work, diffuses, controls and branches for new restaurant build out. electical work to be filed. no change, use, egress or occupancy. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 200 Chambers Street, Manhattan, New York City |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | September 25, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Excavation |
| Company named on the permit | Heights Construction Corp See the decision makers — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Replace existing a.c units, duct work, diffuses, controls and branches for new restaurant build out. electical work to be filed. no change, use, egress or occupancy”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in New York City once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since March 20268 other permits at this address
- March 27, 2026Alteration · under $1M
- April 14, 2026Alteration · under $1M
- September 9, 2026Alteration · under $1M
- September 25, 2026Alteration: Apartment Building Renovation · under $1M (this page)
- October 9, 2026Alteration: electrical · under $1M
- October 12, 2026Alteration: fire protection · under $1M
- April 2026Estimated construction start (estimate)
- October 2026Estimated completion (estimate)
How we estimate: from the same company's first permit at this address (March 2026) and this permit's stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby: 5 more renovations within 1 km
- 199 Chambers Street, ManhattanAlteration · $50M to $100M · August 2026
- 97 Barclay Street, ManhattanAlteration · $50M to $100M · July 2026
- 1 Center Street, ManhattanInterior alteration · $25M to $50M · March 2026
- 1 Pace Plaza, ManhattanInterior alteration · $25M to $50M · March 2026
- 250 Vesey Street, ManhattanAlteration · $10M to $25M · May 2026
63 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →
Heights Construction Corp has 2 other projects in Builtie
- New York City · Alteration · under $1M · 2026
- New York · General Construction · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Apr 2026 – Oct 2026 | Estimate |
| Excavation and Site Work | Mar 2026 – Apr 2026 | Window passed (est.) |
| Construction Site Security | Mar 2026 – May 2026 | Window passed (est.) |
| Concrete and Foundation | Mar 2026 – Apr 2026 | Window passed (est.) |
| Structural Steel | Apr 2026 – May 2026 | Window passed (est.) |
| Elevators | Apr 2026 – May 2026 | Window passed (est.) |
| Framing | Apr 2026 – May 2026 | Window passed (est.) |
| Painting | Apr 2026 – Jun 2026 | Window passed (est.) |
| Masonry | Apr 2026 – May 2026 | Window passed (est.) |
| Waterproofing | Apr 2026 – May 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (April 2026) to the estimated completion (October 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in New York City
Leads for your trade: every trade in New York City.
More projects: every New York City project of $1M+ by address · major projects in New York City.
Compare tools: The Best Construction Lead Generation Software in New York.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 1400 Pitkin Avenue, Brooklyn: Residential Project Renovation
- 14-10 136 Street, Queens: Single-Family House Renovation
- 1327 Bushwick Avenue, Brooklyn: Residential Project Renovation
- 9204 Ridge Boulevard, Brooklyn: Two-Family House Renovation
- 119 Saint Felix Street, Brooklyn: Duplex Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 200 Chambers Street, Manhattan?
Apartment Building Renovation. Replace existing a.c units, duct work, diffuses, controls and branches for new restaurant build out. electical work to be filed. no change, use, egress or occupancy
When was the permit issued for 200 Chambers Street, Manhattan?
September 25, 2026, by New York City.
Who is building 200 Chambers Street, Manhattan?
Heights Construction Corp is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 200 Chambers Street, Manhattan need now?
Estimated from the permit date, the award windows for excavation and site work; site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
