200 World Way, Los Angeles: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 200 World Way, Los Angeles was permitted on September 8, 2025 with a stated construction value of $1M to $5M. **ePlan**LAX**NEW TENANT IMPROVEMENT SCOPE OF WORK: TENANT IMPROVEMENTS TO SUPPORT RELOCATION OF T5 TENANTS (G2 - SERVICE VENDOR, NK - SPIRIT) TO T2. MODIFY (E) BREAK ROOM TO PROVIDE NEW BREAK ROOM, DISPATCH OFFICE, AND OFFICE MANAGER/ADMIN SPACE ON LEVEL 3… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 200 World Way, Los Angeles |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | September 8, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “**ePlan**LAX**NEW TENANT IMPROVEMENT SCOPE OF WORK: TENANT IMPROVEMENTS TO SUPPORT RELOCATION OF T5 TENANTS (G2 - SERVICE VENDOR, NK - SPIRIT) TO T2. MODIFY (E) BREAK ROOM TO PROVIDE NEW BREAK ROOM, DISPATCH OFFICE, AND OFFICE MANAGER/ADMIN SPACE ON LEVEL 3…”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Los Angeles
- 11350 W Palms Blvd: Commercial Project
- 970 N Hoover St: 5-Storey Affordable Housing
- 15503 W Ventura Blvd: Office and Tenant Fit-Out
- 555 S FLOWER ST 49-50 flrs: Office and Tenant Fit-Out
- 1600 N CAMPUS ROAD Booth Hall: Office and Tenant Fit-Out
All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Pasadena, Glendale, Burbank, Long Beach and the rest of Los Angeles County issue their own permits and are not in the feed today. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 200 World Way?
Office and Tenant Fit-Out. **ePlan**LAX**NEW TENANT IMPROVEMENT SCOPE OF WORK: TENANT IMPROVEMENTS TO SUPPORT RELOCATION OF T5 TENANTS (G2 - SERVICE VENDOR, NK - SPIRIT) TO T2. MODIFY (E) BREAK ROOM TO PROVIDE NEW BREAK ROOM, DISPATCH OFFICE, AND OFFICE MANAGER/ADMIN SPACE ON LEVEL 3…
When was the permit issued for 200 World Way?
September 8, 2025, by the City of Los Angeles.
Who is building 200 World Way?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 200 World Way need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
