2060 Sedgwick Avenue, Bronx, New York City: Institutional Project Renovation

Institutional Project Renovation at 2060 Sedgwick Avenue, Bronx, New York City was permitted on August 21, 2026 with a stated construction value of $5M to $10M. BCC Gould Memorial Library, Hall of Fame, Exterior Cornice and Cornice Antefix restoration at existing exterior Hall of Fame Ambulatory, as well as restoration at existing vault tiles. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 2060 Sedgwick Avenue, Bronx, New York City |
| Project | Institutional Project Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | August 21, 2026 |
| Stated construction value | $5M to $10M |
| Estimated stage | Permit |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “BCC Gould Memorial Library, Hall of Fame, Exterior Cornice and Cornice Antefix restoration at existing exterior Hall of Fame Ambulatory, as well as restoration at existing vault tiles”
Which trades are being bought now
The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Excavation and Site Work | Before construction starts |
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 411 West 55 Street, Manhattan: Office-to-Residential Conversion
- 11-27 Foam Place, Queens: 7-Storey Apartment Building
- 160 West 66 Street, Manhattan: Apartment Building Renovation
- 524 West 59 Street, Manhattan: School Renovation
- 620 Atlantic Avenue, Brooklyn: Office and Tenant Fit-Out
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 2060 Sedgwick Avenue, Bronx?
Institutional Project Renovation. BCC Gould Memorial Library, Hall of Fame, Exterior Cornice and Cornice Antefix restoration at existing exterior Hall of Fame Ambulatory, as well as restoration at existing vault tiles
When was the permit issued for 2060 Sedgwick Avenue, Bronx?
August 21, 2026, by New York City.
Who is building 2060 Sedgwick Avenue, Bronx?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 2060 Sedgwick Avenue, Bronx need now?
At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
