21 Melinda St, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 21 Melinda St, Toronto was permitted on January 14, 2026 with a stated construction value of under $1M. Proposal for interior alterations including demolition of interior partitions. Floor 10. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 21 Melinda St, Toronto |
| Neighbourhood | Yonge-Bay Corridor |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | January 14, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Framing |
| Company named on the permit | Panigas Building Construction Ltd. |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for interior alterations including demolition of interior partitions. Floor 10”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since July 20226 other permits at this address
- January 14, 2026Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
- January 16, 2026Fire and life safety · under $1M
- April 14, 2026Addition or alteration: interior alteration · under $1M
- April 14, 2026Plumbing
- June 17, 2026Fire and life safety: fire protection · under $1M
- August 18, 2026Plumbing: demolition
- February 2026Estimated construction start (estimate)
- August 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 77 King St WAddition or alteration: interior alteration · $100M to $250M · May 2026
- 483 Bay StAddition or alteration: structural work · $50M to $100M · May 2026
- 40 Bay StAddition or alteration: elevator · $25M to $50M · April 2026
- 230 Front St WAddition or alteration: interior alteration · $25M to $50M · June 2026
- 81 Bay StAddition or alteration: interior alteration · $25M to $50M · December 2025
67 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Feb 2026 – Aug 2026 | Estimate |
| Construction Site Security | Jan 2026 – Mar 2026 | Window passed (est.) |
| Painting | Feb 2026 – Apr 2026 | Window passed (est.) |
| Masonry | Feb 2026 – Mar 2026 | Window passed (est.) |
| Waterproofing | Feb 2026 – Mar 2026 | Window passed (est.) |
| Roofing | Mar 2026 – Apr 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Feb 2026 – Mar 2026 | Window passed (est.) |
| Electrical | Mar 2026 – Apr 2026 | Window passed (est.) |
| HVAC and Mechanical | Mar 2026 – Apr 2026 | Window passed (est.) |
| Plumbing | Mar 2026 – Apr 2026 | Window passed (est.) |
| Fire Protection | Mar 2026 – Apr 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (February 2026) to the estimated completion (August 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 350 Bay St: Office and Tenant Fit-Out
- 50 Queen St W: Transit Facility
- 65 Queen St W: Office and Tenant Fit-Out
- 70 York St: Office and Tenant Fit-Out
- 141 Adelaide St W: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 21 Melinda St?
Office and Tenant Fit-Out. Proposal for interior alterations including demolition of interior partitions. Floor 10
When was the permit issued for 21 Melinda St?
January 14, 2026, by the City of Toronto.
Who is building 21 Melinda St?
Panigas Building Construction Ltd. is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 21 Melinda St need now?
Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.