65 Queen St W, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 65 Queen St W, Toronto was permitted on October 15, 2025 with a stated construction value of under $1M. Proposal for interior alterations to existing group d occupancy for Kipling - tdb advisory. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 65 Queen St W, Toronto |
| Neighbourhood | Yonge-Bay Corridor |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | October 15, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for interior alterations to existing group d occupancy for Kipling - tdb advisory”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since July 1997120 other permits at this address
- November 30, 2006Fire and life safety: fire protection · under $1M
- July 10, 2007Addition or alteration: interior alteration · under $1M
- November 7, 2007Addition or alteration: interior alteration · under $1M
- August 12, 2008Addition or alteration: interior alteration · under $1M
- November 7, 2017Addition or alteration: interior alteration · under $1M
- October 15, 2025Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
- November 2025Estimated construction start (estimate)
- May 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 3 more renovations within 1 km
- 8 Elm StNew building · over $250M · March 2026
- 120 Peter StMechanical · $100M to $250M · March 2026
- 77 King St WAddition or alteration: interior alteration · $100M to $250M · May 2026
- 483 Bay StAddition or alteration: structural work · $50M to $100M · May 2026
- 40 Bay StAddition or alteration: elevator · $25M to $50M · April 2026
73 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Nov 2025 – May 2026 | Estimate |
| Fire Protection | Dec 2025 – Jan 2026 | Window passed (est.) |
| Signage and Wayfinding | Jan 2026 – Mar 2026 | Window passed (est.) |
| Insulation | Dec 2025 – Jan 2026 | Window passed (est.) |
| Drywall | Dec 2025 – Feb 2026 | Window passed (est.) |
| Low Voltage and Data | Dec 2025 – Feb 2026 | Window passed (est.) |
| Tile | Jan 2026 – Feb 2026 | Window passed (est.) |
| Cabinetry and Millwork | Dec 2025 – Feb 2026 | Window passed (est.) |
| Flooring | Jan 2026 – Feb 2026 | Window passed (est.) |
| Countertops | Jan 2026 – Feb 2026 | Window passed (est.) |
| Finish Carpentry | Jan 2026 – Feb 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (November 2025) to the estimated completion (May 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 350 Bay St: Office and Tenant Fit-Out
- 50 Queen St W: Transit Facility
- 21 Melinda St: Office and Tenant Fit-Out
- 70 York St: Office and Tenant Fit-Out
- 141 Adelaide St W: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 65 Queen St W?
Office and Tenant Fit-Out. Proposal for interior alterations to existing group d occupancy for Kipling - tdb advisory
When was the permit issued for 65 Queen St W?
October 15, 2025, by the City of Toronto.
Who is building 65 Queen St W?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 65 Queen St W need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.