350 Bay St, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 350 Bay St, Toronto was permitted on September 22, 2025 with a stated construction value of under $1M. Proposed interior alterations to existing office for new office suite. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 350 Bay St, Toronto |
| Neighbourhood | Yonge-Bay Corridor |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | September 22, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Primary Construction Inc. |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposed interior alterations to existing office for new office suite”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since March 19996 other permits at this address
- July 10, 2019Addition or alteration · under $1M
- March 4, 2021Addition or alteration: mechanical · under $1M
- July 2, 2021Plumbing · under $1M
- September 22, 2025Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
- April 23, 2026Addition or alteration: interior alteration · under $1M
- June 17, 2026Plumbing
- October 2025Estimated construction start (estimate)
- April 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 4 more renovations within 1 km
- 8 Elm StNew building · over $250M · March 2026
- 77 King St WAddition or alteration: interior alteration · $100M to $250M · May 2026
- 483 Bay StAddition or alteration: structural work · $50M to $100M · May 2026
- 40 Bay StAddition or alteration: elevator · $25M to $50M · April 2026
- 230 Front St WAddition or alteration: interior alteration · $25M to $50M · June 2026
71 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Primary Construction Inc. has 4 other projects in Builtie
- Toronto · Non-Residential Building Permit: interior alteration · $1M to $5M · 2000
- Toronto · Addition or alteration: interior alteration · under $1M · 2025
- Toronto · Addition or alteration · under $1M · 1998
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Oct 2025 – Apr 2026 | Estimate |
| Fire Protection | Nov 2025 – Dec 2025 | Window passed (est.) |
| Signage and Wayfinding | Jan 2026 – Feb 2026 | Window passed (est.) |
| Insulation | Nov 2025 – Jan 2026 | Window passed (est.) |
| Drywall | Dec 2025 – Jan 2026 | Window passed (est.) |
| Low Voltage and Data | Dec 2025 – Jan 2026 | Window passed (est.) |
| Tile | Dec 2025 – Jan 2026 | Window passed (est.) |
| Cabinetry and Millwork | Dec 2025 – Jan 2026 | Window passed (est.) |
| Flooring | Dec 2025 – Jan 2026 | Window passed (est.) |
| Countertops | Dec 2025 – Jan 2026 | Window passed (est.) |
| Finish Carpentry | Dec 2025 – Jan 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (October 2025) to the estimated completion (April 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 50 Queen St W: Transit Facility
- 65 Queen St W: Office and Tenant Fit-Out
- 21 Melinda St: Office and Tenant Fit-Out
- 70 York St: Office and Tenant Fit-Out
- 141 Adelaide St W: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 350 Bay St?
Office and Tenant Fit-Out. Proposed interior alterations to existing office for new office suite
When was the permit issued for 350 Bay St?
September 22, 2025, by the City of Toronto.
Who is building 350 Bay St?
Primary Construction Inc. is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 350 Bay St need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
