50 Queen St W, Toronto: Transit Facility

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Transit Facility at 50 Queen St W, Toronto was permitted on March 3, 2026 with a stated construction value of under $1M. Proposal for 3 stacked modules creating a temporary site office for use by construction personnel. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address50 Queen St W, Toronto
NeighbourhoodYonge-Bay Corridor
ProjectTransit Facility
Building typeInstitutional
WorkNew building
Permit issuedMarch 3, 2026
Stated construction valueunder $1M
Estimated stageFraming
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal for 3 stacked modules creating a temporary site office for use by construction personnel”

Where this project is

  1. March 3, 2026New construction: Transit Facility · under $1M (this page)
  2. March 3, 2026New construction · under $1M
  3. April 2026Estimated construction start (estimate)
  4. October 2026Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 8 Elm StNew building · over $250M · March 2026
  • 77 King St WAddition or alteration: interior alteration · $100M to $250M · May 2026
  • 483 Bay StAddition or alteration: structural work · $50M to $100M · May 2026
  • 40 Bay StAddition or alteration: elevator · $25M to $50M · April 2026
  • 230 Front St WAddition or alteration: interior alteration · $25M to $50M · June 2026

72 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Apr 2026 – Oct 2026Estimate
Construction Site SecurityMar 2026 – Apr 2026Window passed (est.)
PaintingApr 2026 – Jun 2026Window passed (est.)
MasonryApr 2026Window passed (est.)
WaterproofingApr 2026Window passed (est.)
RoofingApr 2026 – May 2026Window passed (est.)
Windows, Doors and GlazingApr 2026 – May 2026Window passed (est.)
ElectricalApr 2026 – Jun 2026Window passed (est.)
HVAC and MechanicalApr 2026 – Jun 2026Window passed (est.)
PlumbingApr 2026 – Jun 2026Window passed (est.)
Fire ProtectionApr 2026 – Jun 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (April 2026) to the estimated completion (October 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 50 Queen St W?

Transit Facility. Proposal for 3 stacked modules creating a temporary site office for use by construction personnel

When was the permit issued for 50 Queen St W?

March 3, 2026, by the City of Toronto.

Who is building 50 Queen St W?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 50 Queen St W need now?

Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.