215 Lexington Avenue, Manhattan, New York City: Office and Tenant Fit-Out
Follow this project · we email you when its status or build stage changes

Office and Tenant Fit-Out at 215 Lexington Avenue, Manhattan, New York City was filed with New York City on May 1, 2026 with a stated construction value of under $1M; the city has not approved it yet (DOB status: Objections). RENOVATE EXISTING OFFICE 16th FLOOR: REMOVE NON-LOAD BEARING PARTITIONS, DROP CEILING AND FLOOR FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 215 Lexington Avenue, Manhattan, New York City |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Filed with the city | May 1, 2026 |
| City status | Not yet approved (DOB status: Objections) |
| Stated construction value | under $1M |
| Estimated stage | Framing |
| Company named on the permit | Addvanced Carpentry Inc. See the decision makers — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “RENOVATE EXISTING OFFICE 16th FLOOR: REMOVE NON-LOAD BEARING PARTITIONS, DROP CEILING AND FLOOR FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in New York City once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- May 1, 2026Alteration: Office and Tenant Fit-Out · under $1M (this page)
- June 3, 2026Alteration CO: interior alteration · under $1M
- June 16, 2026Interior alteration · under $1M
- June 18, 2026Alteration: plumbing · under $1M
- June 18, 2026Alteration: mechanical · under $1M
- June 19, 2026Alteration: fire protection · under $1M
- May 2026Estimated construction start (estimate)
- December 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 229 East 42 Street, ManhattanAlteration CO: conversion to residential · $50M to $100M · July 2026
- 6 East 43 Street, ManhattanAlteration CO: conversion to residential · $50M to $100M · September 2026
- 333 East 38 Street, ManhattanAlteration: mechanical · $25M to $50M · July 2026
- 133 East 40 Street, ManhattanAlteration CO: conversion to residential · $25M to $50M · August 2026
- 95 Madison Avenue, ManhattanAlteration CO: conversion to residential · $25M to $50M · September 2026
130 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | May 2026 – Dec 2026 | Estimate |
| Construction Site Security | Apr 2026 – Jun 2026 | Window passed (est.) |
| Painting | May 2026 – Jul 2026 | Window passed (est.) |
| Masonry | May 2026 – Jun 2026 | Window passed (est.) |
| Waterproofing | May 2026 – Jun 2026 | Window passed (est.) |
| Roofing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Windows, Doors and Glazing | May 2026 – Jul 2026 | Window passed (est.) |
| Electrical | Jun 2026 – Jul 2026 | Window passed (est.) |
| HVAC and Mechanical | Jun 2026 – Jul 2026 | Window passed (est.) |
| Plumbing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Fire Protection | Jun 2026 – Jul 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (May 2026) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in New York City
Leads for your trade: every trade in New York City.
More projects: every New York City project of $1M+ by address · major projects in New York City.
Compare tools: The Best Construction Lead Generation Software in New York.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 121 West 88 Street, Manhattan: Two-Family House Renovation
- 523 Fulton Street, Brooklyn: Office and Tenant Fit-Out
- 730 64 Street, Brooklyn: Office and Tenant Fit-Out
- 467 Rogers Avenue, Brooklyn: Duplex Renovation
- 116-24 120 Street, Queens: Two-Family House Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 215 Lexington Avenue, Manhattan?
Office and Tenant Fit-Out. RENOVATE EXISTING OFFICE 16th FLOOR: REMOVE NON-LOAD BEARING PARTITIONS, DROP CEILING AND FLOOR FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Has 215 Lexington Avenue, Manhattan been permitted?
Not yet. The work was filed with New York City on May 1, 2026; the city has not approved it yet (DOB status: Objections).
Who is building 215 Lexington Avenue, Manhattan?
Addvanced Carpentry Inc. is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 215 Lexington Avenue, Manhattan need now?
Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.