218-24 Hartland Avenue, Queens, New York City: 3-Storey School Renovation

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

3-Storey School Renovation at 218-24 Hartland Avenue, Queens, New York City was permitted on September 24, 2026 with a stated construction value of under $1M. P.s. 188-q: support of excavation for a new 3-story school building. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address218-24 Hartland Avenue, Queens, New York City
Project3-Storey School Renovation
Building typeInstitutional
WorkRenovation or alteration
Permit issuedSeptember 24, 2026
Stated construction valueunder $1M
Estimated stagePermit
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “P.s. 188-q: support of excavation for a new 3-story school building”

Where this project is

  1. Since March 20264 other permits at this address
  2. March 17, 2026New building
  3. March 17, 2026New construction: excavation and shoring
  4. April 1, 2026New construction
  5. April 1, 2026New building
  6. April 14, 2026New construction
  7. September 24, 2026Alteration: 3-Storey School Renovation ยท under $1M (this page)
  8. October 2026Estimated construction start (estimate)
  9. April 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 6 to approach now, 1 coming up.

TradeWhen to approach (est.)Status
Construction (est.)Oct 2026 – Apr 2027Estimate
Excavation and Site WorkOct 2026Approach now
Construction Site SecurityOct 2026 – Nov 2026Approach now
Concrete and FoundationOct 2026 – Nov 2026Approach now
Structural SteelOct 2026 – Nov 2026Approach now
ElevatorsOct 2026 – Nov 2026Approach now
FramingOct 2026 – Nov 2026Approach now
PaintingNov 2026 – Dec 2026Coming up

How we estimate: each bar is the share of the build, from the estimated start (October 2026) to the estimated completion (April 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 218-24 Hartland Avenue, Queens?

3-Storey School Renovation. P.s. 188-q: support of excavation for a new 3-story school building

When was the permit issued for 218-24 Hartland Avenue, Queens?

September 24, 2026, by New York City.

Who is building 218-24 Hartland Avenue, Queens?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 218-24 Hartland Avenue, Queens need now?

Estimated as of October 2026, the trades to approach now are excavation and site work; site security; concrete; structural steel; elevator; framing. Coming up: painting from November 2026.